公開日期 | 標題 | 作者 | 來源出版物 | scopus | WOS | 全文 |
1996 | Daily scheduling for R&D semiconductor fabrication | Liao, Da-Yin; Chang, Shi-Chung ; Pei, Kuo-Wei; Chang, Chi-Ming | IEEE Transactions on Semiconductor Manufacturing | 52 | 39 | |
1993 | Daily scheduling for R&D semiconductor fabrication | Liao, Da-Yin; Chang, Shi-Chung; Yen, Shou-Ren; SHI-CHUNG CHANG | Robotics and Automation, 1993. Proceedings., 1993 IEEE International Conference on | 0 | 0 | |
2017 | Decentralized dispatching for blocking avoidance in automate material handling systems | Chen, Y.-S.; Wu, C.-H.; CHENG-HUNG WU ; SHI-CHUNG CHANG | Winter Simulation Conference | 4 | 0 | |
1999 | Demand-driven, iterative capacity allocation and cycle time estimation for re-entrant lines | SHI-CHUNG CHANG | Proceedings of the IEEE Conference on Decision and Control | 6 | 0 | |
2003 | Design of a Lagrangian relaxation-based hierarchical production scheduling environment for semiconductor wafer fabrication | Hwang, T.-K.; Chang, S.-C.; SHI-CHUNG CHANG | IEEE Transactions on Robotics and Automation | 31 | 18 | |
2005 | Design of collaborative engineering data system (CEDS): An application case of process integration | Fan, C.-M.; Chang, S.-C.; Chang, H.; SHI-CHUNG CHANG | IEEE International Symposium on Semiconductor Manufacturing Conference | | | |
1998 | Design of self-healing algorithm for ATM networks | Gao, Wei-Bin; SHI-CHUNG CHANG ; Chang, Chi-Tseng | Proceedings - 12th International Conference on Information Networking, ICOIN 1998 | 3 | 0 | |
2010 | Design of standard modeling process for tool sequencing optimization under given robot control logics: A PVD case | Hsu; P.-M.; Chen; J.-L.; Chang; J.; Chiou; S.-C.; Ho; J.-H.; Chang; S.-C.; Sun; L.-L.; Luh; P.B.; SHI-CHUNG CHANG | IEEE International Symposium on Semiconductor Manufacturing | | | |
2014 | Design of truthful double auction for dynamic spectrum sharing | Zhan, S.-C.; Chang, S.-C.; SHI-CHUNG CHANG | 2014 IEEE International Symposium on Dynamic Spectrum Access Networks | 13 | 0 | |
1995 | Design, implementation, and applications of a B-ISDN simulation testbed | Chang, Jin-Fu; Chang, Shi-Chung; Tsai, Zsehong; Wu, Jung-Shyr; SHI-CHUNG CHANG ; ZSEHONG TSAI | 28th Annual Simulation Symposium, 1995 | 1 | 0 | |
1994 | Dispatching-Driven Deadlock Avoidance Controller Synthesis for Flexible Manufacturing Systems | Hsieh, F.-S.; Chang, S.-C.; SHI-CHUNG CHANG | IEEE Transactions on Robotics and Automation | 216 | 188 | |
2014 | Do we still need daily production target setting in fully automated fabs? | Kao, Y.-T.; Chang, C.-M.; Chang, S.-C.; SHI-CHUNG CHANG | 2014 e-Manufacturing and Design Collaboration Symposium | | | |
2015 | Does win-win situation exist in a monopolistic cable television service market by adding a price-channel-downscaled package? | Lin, C.-Y.; Liu, C.-J.; Chang, S.-C.; Chen, M.-H.; SHI-CHUNG CHANG | CTTE 2015 - 2015 Conference of Telecommunication, Media and Internet Techno-Economics | 0 | 0 | |
2016 | Double Auction Design for Short-Interval and Heterogeneous Spectrum Sharing. | Zhan, Shun-Cheng; Chang, Shi-Chung; SHI-CHUNG CHANG | IEEE Trans. Cogn. Comm. & Networking | 0 | 0 | |
1998 | A dynamic binding model for service creation in virtual fab | SHI-CHUNG CHANG ; Chou T.-L.; RUEY-SHAN GUO ; Su Y.-H.; Lu L.-L.; Lai I.-C. | 1998 Semiconductor Manufacturing Technology Workshop, SMTW 1998 | 3 | 0 | |
2000 | Dynamic scheduling rule selection for fab operations | Hsieh, Bo-Wei; SHI-CHUNG CHANG ; Chen, Chun-Hung | 2000 Semiconductor Manufacturing Technology Workshop | 2 | 0 | |
2001 | Dynamic scheduling rule selection for semiconductor wafer fabrication | Hsieh, Bo-Wei; Chang, Shi-Chung; SHI-CHUNG CHANG | Robotics and Automation, 2001. Proceedings 2001 ICRA. IEEE International Conference on | 0 | 0 | |
1989 | Effective differential dynamic programming algorithm for constrained optimal control problems | Chen, Chun-Hung; Chang, Shi-Chung; Fong, I-Kong; SHI-CHUNG CHANG | | | | |
2010 | Effective WIP flow estimation for daily fab production target setting with consideration of variability | Kao, Y.-T.; Chang, S.-C.; Luh, P.B.; Wang, S.; Chuang, H.; Chang, J.; SHI-CHUNG CHANG | IEEE International Symposium on Semiconductor Manufacturing | | | |
2012 | Efficient and waiting time violation-free furnace tool allocation via integration of sequencing constraints | Kao, Y.-T.; Zhan, S.-C.; Chang, S.-C.; SHI-CHUNG CHANG | 2012 e-Manufacturing and Design Collaboration Symposium | 1 | 0 | |