公開日期 | 標題 | 作者 | 來源出版物 | scopus | WOS | 全文 |
2020 | Combating lead-time uncertainty in global supply chain's shipment-assignment: Is it wise to be risk-averse? | Sun, X.; Chung, S.-H.; Choi, T.-M.; Sheu, J.-B.; JIUH-BIING SHEU ; TSAN MING CHOI | Transportation Research Part B: Methodological | 22 | 19 | |
2008 | Kinematic synthesis of a four-link mechanism with rolling contacts for motion and function generation | JYH-JONE LEE ; Sheu, Jinn-Biau; Sheu, J.-B.; Hu, Sheng-Lun; Lee, Jyh-J.; Lee, Jyh-Jone ; Hu, S.-L. | Mathematical and Computer Modelling | 3 | 3 | |
2012 | On the fail-safe design of tendon-driven manipulators with redundant tendons | Sheu, J.-B.; Liu, T.; Lee, J.-J.; Sheu, Jinn-Biau; Liu, Tyng; Lee, Jyh-Jone; JYH-JONE LEE ; TYNG LIU | Journal of Mechanical Science and Technology | | | |
2012 | Optimization design of tendon-driven manipulators with high fault tolerance | Sheu, J.-B.; Lee, J.-J.; Sheu, Jinn-Biau; Lee, Jyh-Jone; JYH-JONE LEE | Journal of the Chinese Institute of Engineers,Series A/Chung-kuo Kung Ch'eng Hsuch K'an | | | |
2009 | Synthesis of tendon-driven manipulators with high fault tolerance | Sheu, J.-B.; Lee, J.-J.; JYH-JONE LEE | IEEE International Conference on Systems, Man and Cybernetics | | | |