標題: | Development of an object-oriented scheduling model for construction projects | 作者: | Fan, Su-Ling Tserng, H.P. HUI-PING TSERNG |
關鍵字: | Scheduling;Soft logic;Object-oriented | 公開日期: | 2003 | 出版社: | Taipei:National Taiwan University Dept Civil Engn | 起(迄)頁: | - | 來源出版物: | Automation in Construction 12, 283–302 | 摘要: | The relations of the construction activities can be demonstrated by fixed and soft logics. The fixed logic provides only a logic sequence of the construction activities. On the other hand, soft logic provides other possibilities of analyzing the activities. The current network techniques presume that there is only one logical sequence of the activities in a project. Therefore, planners need to choose one particular logical sequence even if there is more than one solution. This causes the time-consuming problem of schedule updating on soft-logic sequencing. This paper discusses the factors that influence the sequencing of the soft-logic and the heuristic sequencing principles. It develops algorithms incorporating with the heuristic sequencing principles to automatically identify the logical sequence of activities with soft logic that satisfies the given factors, and encapsulates the concept in a model with object-oriented paradigm. |
URI: | http://ntur.lib.ntu.edu.tw//handle/246246/2006111501244246 | 其他識別: | 246246/2006111501244246 | DOI: | 10.1016/S0926-5805(02)00092-4 |
顯示於: | 土木工程學系 |
在 IR 系統中的文件,除了特別指名其著作權條款之外,均受到著作權保護,並且保留所有的權利。