https://scholars.lib.ntu.edu.tw/handle/123456789/472097
標題: | Post-storm debris removal considering traffic and psychological impacts | 作者: | Hu Z.-H. JIUH-BIING SHEU Wei C. Hu S.-L. |
關鍵字: | emergency logistics; post-disaster debris management; psychological impact; traffic impact; Transportation problem; waiting time | 公開日期: | 2019 | 卷: | 15 | 期: | 2 | 起(迄)頁: | 1145-1174 | 來源出版物: | Transportmetrica A: Transport Science | 摘要: | A multi-objective linear program is formulated for systematically minimizing aggregate logistics costs, including economic costs (debris transportation and sweeping, and urgent recruitment of related trucks and people), traffic impacts (blockage and congestion caused by debris removal) and psychological impacts (perceived by communities) in post-storm debris removal. Three distinctive features are formulated: the urgent recruitment prices of debris treatment resources decrease with time; the traffic impacts relate with the busy degrees of the corresponding roads, and the settings are different for nighttime and daytime; and the psychological impact is formulated as a function of waiting time. The numerical studies performed by the proposed model reveal that reducing the economic cost and reducing the psychological impact are conflicting objectives; a 90% decrease in psychological impact increases economic cost by 10%; work at nighttime can decrease traffic and psychological impacts. Some generalizations and managerial implications are also discussed based on numerical studies. © 2019, © 2019 Hong Kong Society for Transportation Studies Limited. |
URI: | https://scholars.lib.ntu.edu.tw/handle/123456789/472097 | DOI: | 10.1080/23249935.2019.1567618 | SDG/關鍵字: | Costs; Debris; Linear programming; Storms; Debris management; Emergency logistics; psychological impact; Traffic impacts; Transportation problem; Waiting-time; Traffic congestion |
顯示於: | 工商管理學系 |
在 IR 系統中的文件,除了特別指名其著作權條款之外,均受到著作權保護,並且保留所有的權利。