標題: | Case study on economic evaluation of gasification investment using bamboo processing residue in Zhushan area, Taiwan [竹加工剩餘資材氣化發電投資計畫之效益研究-以南投竹山地區為例] | 作者: | CHYI-RONG CHIOU Wang S.-L Yao S.-J Lee D.-R Lin Y.-J. |
關鍵字: | Bamboo; Costs; Earnings; Economic analysis; Electric power system interconnection; Gas generators; Gasification; Losses; Costs and benefits; Economic evaluations; Evaluation results; Internal rate of return; Power generation systems; Processing industry; Processing residues; The net present value (NPV); Investments | 公開日期: | 2020 | 卷: | 35 | 期: | 1 | 起(迄)頁: | 13-35 | 來源出版物: | Taiwan Journal of Forest Science | 摘要: | Taiwan is a country highly dependent on imported energy, but it possesses abundant bamboo residue resources; therefore, it is important and necessary to make the best use of those resources to develop technologies to convert residues into biomass energy. The purpose of this study was to evaluate the costs and benefits of two investment plans for an updraft gasification power generation system using bamboo residues in the Zhushan area, Nantou County, central Taiwan. According to the annual amount of bamboo residue from an individual bamboo processing company and from most bamboo processing industries in the Zhushan region, this study investigated 2 investment plans of gasification power generation: a single plant and a regional plant. The evaluation results showed that the single-plant investment plan, with an operating time of 1,000 h yr-1, power generation of 80,000 kWh yr-1, and bamboo residue consumption of 300 tons yr-1, could create an operating benefit of around NT$1,354,000 yr-1 (the exchange rate in 2019 was US$1?New Taiwan (NT)$31.09), but the operation still exhibited a financial loss after deducting necessary costs. The net present value (NPV) calculated for an operation period of 15 yr was -NT$4,497,588 with an internal rate of return of -2.26% and a required payback period of more than 59 yr. The regional-plant investment plan, under an operating time 5600 h yr-1, power generation of 2,240,000 kWh yr-1, and bamboo residue consumption of 8,400 tons yr-1, created an operating benefit of around NT$35,482,000 yr-1. The NPV of this investment plan calculated over 15 yr was NT$107,663,898 with an internal rate of return of 26.54%, and only 5 yr was required to recover the initial investment costs. In comparison, the regional-plant investment plan of gasification power generation would be a more-feasible and better choice for investors because of larger-scale advantages and relatively greater profits. ? 2020 Taiwan Forestry Research Institute. All rights reserved. |
URI: | https://www.scopus.com/inward/record.uri?eid=2-s2.0-85091467807&partnerID=40&md5=7569258ea5955b4decd1cc769bd7693e https://scholars.lib.ntu.edu.tw/handle/123456789/572754 |
ISSN: | 10264469 |
顯示於: | 森林環境暨資源學系 |
在 IR 系統中的文件,除了特別指名其著作權條款之外,均受到著作權保護,並且保留所有的權利。