公開日期 | 標題 | 作者 | 來源出版物 | scopus | WOS | 全文 |
2011 | Fashion products with asymmetric sales horizons | Wu A.W.-D.; MING-HUANG CHIANG | Naval Research Logistics | | | |
2010 | Forward echelon-based inventory monitoring in a semiconductor supply Chain | Guo R.-S.; Chiang M.-H.; Lin H.-W.; MING-HUANG CHIANG ; Guo, R.-S. | IEEE Transactions on Semiconductor Manufacturing | 1 | 1 | |
2007 | Forward echelon-based inventory monitoring in semiconductor supply chain | Guo R.-S.; Chiang D.; Lin H.-W.; MING-HUANG CHIANG ; RUEY-SHAN GUO | IEEE International Symposium on Semiconductor Manufacturing Conference Proceedings | 0 | 0 | |
2007 | A Heuristic Algorithm for Estimating Retail Market Size Using POS Data | 陳靜枝(Ching-Chin Chern); 蔣明晃(David Ming-Huang Chiang) ; CHING-CHIN CHERN | 資訊管理學報 | 0 | 0 | |
2011 | Identifying critical features of complex systems under prior known conditions | Chang C.-W.; MING-HUANG CHIANG ; Wu A.W.-D.; Chang Y.-C. | Computers and Industrial Engineering | | | |
2009 | The impact of estimation error on the dynamic order admission policy in B2B MTO environments | Wu A.W.-D.; MING-HUANG CHIANG | Expert Systems with Applications | | | |
2008 | Improved Customer Satisfaction with a Hybrid Dispatching Rule in Semiconductor Back-end Factories | Chiang, Ming-Huang ; Guo, Ruey-Shan ; Pai, Fan-Yun | International Journal of Production Research | 25 | 20 | |
2007 | Multi-objectives exception management model for semiconductor back-end environment under turnkey service | Guo, Ruey-Shan ; Chiang, David M.; MING-HUANG CHIANG | Production Planning & Control | 8 | 9 | |
2004 | Multi-Plant Production Planning Coordination in a Multi-Echelon Supply Chain | David M. Chiang; Ji-Chyuan Liu; Ruey-Shan Guo; MING-HUANG CHIANG | Fifth Asia-Pacific Conference on Industrial Engineering and Management System | | | |
2002 | Optimal Online Interactive Service Policy and Pricing Decision with Negative Network Externality | Teng, D. C.; MING-HUANG CHIANG | The Second International Conference on Electronic Business:ICEB 2002 | | | |
2005 | Optimal Ordering Policy by Considering the Trade-off between Discount Vendor and Emergency Vendor | David M. Chiang; Ruey-Shan Guo; Fan-Yun Pai; Kuang-Chi, Chen; MING-HUANG CHIANG | Sixth Asia-Pacific Conference on Industrial Engineering and Management System | | | |
2005 | Optimal Policy with Negative Network Externality under Finite Capacity | Teng, D. C.; MING-HUANG CHIANG | INFORMS. | | | |
2005 | Optimal Supply Chain Configurations in Semiconductor Manufacturing | David M. Chiang; Ruey-Shan Guo; Argon Chen et al.; MING-HUANG CHIANG | 3rd International Conference on Modeling and Analysis of Semiconductor Manufacturing | | | |
2007 | Optimal supply chain configurations in semiconductor manufacturing | MING-HUANG CHIANG ; RUEY-SHAN GUO ; ARGON CHEN ; Cheng, Meng-Tse; Chen, Cheng-Bang | International Journal of Production Research | 15 | 15 | |
2002 | Optimization-Based Available-to-Promise Allocation Model | Ruey-Shan Guo; David M. Chiang; Jen-Yi Chen; MING-HUANG CHIANG | Fourth Asia-Pacific Conference on Industrial Engineering and Management System | | | |
2007 | Optimizing Fund Allocation by considering RAROC | 蔣明晃 ; 郭瑞祥 ; 陳佳滎 | INFORMS Annual Meeting Seattle 2007 | | | |
2005 | Order Dispatching and Scheduling Report for Taiwan LiteOn Company | 蔣明晃 | | | | |
2005 | ORDER DISPATCHING AND SCHEDULING REPORT FOR TAIWAN LITEON COMPANY(台灣光寶) | 蔣明晃 | | | | |
2013 | Partner selection model for design chain collaboration | Chen J.-Y.; Chiang D.M.-H.; MING-HUANG CHIANG ; RUEY-SHAN GUO | International Journal of Production Research | 13 | 11 | |
2010 | Partner Selection Model for Green Design | Ming-Huang Chiang; Ruey-Shan Guo; Jia-Ying Chen; MING-HUANG CHIANG | 11th Asia-Pacific Conference on Industrial Engineering and Management System | | | |