2002 | A 3-D graphical database system for landfill operations using GPS | Tserng, H.P.; Russell, J.S.; HUI-PING TSERNG | Computer-Aided Civil and Infrastructure Engineering | | | |
2002 | An accelerated subcontracting and procuring model for construction projects | Tserng, H.P.; Lin, P.H.; HUI-PING TSERNG | Automation in Construction | | | |
2014 | An implementation of light-weight compression algorithm for wireless sensor network technology in structure health monitoring | Hsu, C.-H.; Lin, C.-T.; Tserng, H.-P.; CHIH-TING LIN ; HUI-PING TSERNG ; JEN-YU HAN | 2014 IEEE World Forum on Internet of Things | 12 | 0 | |
2009 | Analysing dispute mediation cases of infrastructure projects through project life cycle | Tserng, H.P.; Teng, W.-K.; HUI-PING TSERNG | Structure and Infrastructure Engineering | | | |
2012 | Analyzing the Role of National PPP Unit in Promoting PPP—Using New Institutional Economics and Case Study | HUI-PING TSERNG ; Russell, Jeffrey S.; Hsu, Ching-Wen; Lin, Chieh | Journal of Construction Engineering and Management | 45 | 42 | |
2006 | Automated construction of the Paghuashan tunnel for Taiwan High Speed Rail (THSR) project | Lin, P.H.; Tserng, H.P.; Lin, C.C.; HUI-PING TSERNG | Automation in Construction | | | |
2005 | Automating schedule review for expressway construction | Dzeng, R.J.; Tserng, H.P.; Wang, W.C.; HUI-PING TSERNG | Journal of Construction Engineering and Management | | | |
2017 | Automating the generation of indoor space topology for 3D route planning using BIM and 3D-GIS techniques | Lin W.Y; Lin P.H; Tserng H.P.; HUI-PING TSERNG | ISARC 2017 - Proceedings of the 34th International Symposium on Automation and Robotics in Construction | | | |
1998 | AutoPave: Towards an automated paving system for asphalt pavement compaction operations | Krishnamurthy, B.K.; Tserng, H.-P.; Schmitt, R.L.; Russell, J.S.; Bahia, H.U.; Hanna, A.S.; HUI-PING TSERNG | Automation in Construction | | | |
2008 | Closure to "developing a Resource Supply Chain Planning System for Construction Projects" by H. Ping Tserng, Samuel Y. L. Yin, and Sherman H. A. Li | HUI-PING TSERNG ; Yin, S.Y.L.; Li, Sherman H. A. | Journal of Construction Engineering and Management | 1 | 1 | |
2012 | Comparison analysis of emergency evacuation between computer simulations and real exercises for large-space buildings | Tserng, H.P.; You, J.-Y.; Chang, C.-Y.; Hsiung, K.-H.; HUI-PING TSERNG | Journal of the Chinese Institute of Engineers, Transactions of the Chinese Institute of Engineers, Series A | | | |
1998 | Computer-integrated collaborative design and operation in the construction industry | Veeramani, D.; Tserng, H.P.; Russell, J.S.; HUI-PING TSERNG | Automation in Construction | | | |
2023 | A Contingency Model of Strategic Responses to the Institutional Challenges in Emerging Countries: Evidence and Findings from Least Developed Countries | Ping Ho, S.; Dahal, Rameshwar; HUI-PING TSERNG | Journal of Management in Engineering | 2 | 2 | |
2013 | Contractor financial prequalification using simulation method based on cash flow model | Wen-Haw Huang; HUI-PING TSERNG ; HSIEN-HSING LIAO ; Samuel Y.L. Yin; PO-CHENG HSU ; Man Cheng Lei | Automation in Construction | 17 | 12 | |
2012 | Critical factors and risk allocation for PPP policy: Comparison between HSR and general infrastructure projects | Chou, J.-S.; Ping Tserng, H.; Lin, C.; Yeh, C.-P.; HUI-PING TSERNG | Transport Policy | | | |
2000 | Determining minimum contract time for highway projects | Shr, J. F.; Thompson, B. P.; Russell, J. S.; Ran, B.; Tserng, H. P.; HUI-PING TSERNG | Construction 2000: Materials and Construction | | | |
2000 | Determining minimum contract time for highway projects | Shr, J.-F.; Thompson, B.P.; Russell, J.S.; Ran, B.; Tserng, H.P.; HUI-PING TSERNG | Transportation Research Record | | | |
2011 | Developing a Construction-Duration Model Based on a Historical Dataset for Building Project | Lin, Ming-Chiao; Tserng, Hui Ping ; Ho, Shih-Ping ; Young, Der-Liang | Journal of Civil Engineering and Management | 22 | 18 | |
2009 | Developing a precast production management system using RFID technology | Yin, S.Y.L.; Tserng, H.P.; Wang, J.C.; Tsai, S.C.; HUI-PING TSERNG | Automation in Construction | | | |
2008 | Developing a project knowledge management framework for tunnel construction: Lessons learned in Taiwan | Tserng, H.P.; Chang, C.-H.; HUI-PING TSERNG | Canadian Journal of Civil Engineering | | | |