公開日期 | 標題 | 作者 | 來源出版物 | scopus | WOS | 全文 |
2011 | Near optimal furnace tool allocation with batching and waiting time constraints | Kao, Y.-T.; Zhan, S.-C.; Chang, S.-C.; Ho, J.-H.; Wang, P.; Luh, P.B.; Wang, S.; Wang, F.; Chang, J.; SHI-CHUNG CHANG | IEEE International Conference on Automation Science and Engineering | 9 | 0 | |
1986 | ON THE COMPUTATION OF OPTIMAL STRATEGIES FOR LARGE SCALE CONTROL PROBLEMS. | Chang, Tsu-Shuan; Jin, Xiao-Xuan; Luh, Peter B.; Chang, Shi-Chung; SHI-CHUNG CHANG | IEEE Conference on Decision and Control | | | |
2004 | Optimal auction for the deregulated electricity market using augmented lagrangian and surrogate optimization | Luh, P.B.; Blankson, W.E.; Chen, Y.; Yan, J.H.; Stern, G.A.; Chang, S.-C.; Zhao, F.; SHI-CHUNG CHANG | 2004 IEEE PES Power Systems Conference and Exposition | | | |
1985 | OPTIMAL TASK ALLOCATION OF TWO SERVICE STATIONS WITH THREE CLASSES OF TASKS. | Wu, Z.J.; Luh, P.B.; Chang, S.C.; Serfaty, D.; Kleinman, D.L.; Castanon, D.A.; SHI-CHUNG CHANG | IEEE Conference on Decision and Control | | | |
2010 | Optimal Wet-furnace Machine Allocation for Daily Fab Production | SHI-CHUNG CHANG | | | | |
1992 | Order and production scheduling rescheduling for flow shops | Chang, Shi-Chung; SHI-CHUNG CHANG | Robotics and Automation, 1992. Proceedings., 1992 IEEE International Conference on | 0 | 0 | |
1986 | PARALLEL ALGORITHM FOR TEMPORAL DECOMPOSITION OF LONG HORIZON OPTIMAL CONTROL PROBLEMS. | Chang, Shi-Chung; Luh, Peter B.; Chang, Tsu-Shuan; SHI-CHUNG CHANG | IEEE Conference on Decision and Control | | | |
1989 | Parallel algorithm for the time decomposition approach to constrained optimal control problems | Chang, Shi-Chung; Chen, Chun-Hung; Fong, I-Kong; SHI-CHUNG CHANG | | | | |
1988 | Parallel two-level algorithm for constrained optimal control | Shi, Jian; Luh, Peter B.; Chang, Shi-Chung; Chang, Tsu-Shuan; SHI-CHUNG CHANG | IEEE Conference on Decision and Control | | | |
2006 | Payment cost minimization auction for deregulated electricity markets using surrogate optimization | Luh, P.B.; Blankson, W.E.; Chen, Y.; Yan, J.H.; Stern, G.A.; SHI-CHUNG CHANG ; Zhao, F. | IEEE Transactions on Power Systems | 53 | 47 | |
2008 | Payment cost minimization auction for deregulated electricity markets with transmission capacity constraints | Zhao, F.; Luh, P.B.; Yan, J.H.; Stern, G.A.; Chang, S.-C.; SHI-CHUNG CHANG | IEEE Transactions on Power Systems | 42 | 36 | |
1995 | Performance evaluation of a cache-coherent multi-processor by iterative mean value analysis | Huang, C.-Y.; Chang, S.-C.; Chen, C.-L.; SHI-CHUNG CHANG | Performance Evaluation | 1 | 0 | |
2000 | Pricing and fee sharing for point to multipoint and quality guaranteed multicast services | Liu, C.-C.; Chang, S.-C.; Cheng, H.-H.; SHI-CHUNG CHANG | 7th International Conference on Parallel and Distributed Systems | 4 | 0 | |
2006 | Priority behavior modeling of fab for supply chain management | Chang, S.-C.; Liao, B.-J.; SHI-CHUNG CHANG ; ARGON CHEN | IEEE International Symposium on Semiconductor Manufacturing Conference | 0 | 0 | |
2009 | Priority cycle time behavior modeling for semiconductor fabs | Chang, S.-C.; Liao, B.-J.; Kao, Y.-T.; SHI-CHUNG CHANG ; ARGON CHEN | 1st International Conference on Advances in System Simulation | 0 | 0 | |
2008 | Priority mix planning for cycle time-differentiated semiconductor manufacturing | SHI-CHUNG CHANG ; Su, S.-S.; Chen, K.-J. | Winter Simulation Conference | 3 | 0 | |
2006 | Priority X-factor modeling for differentiated manufacturing service planning | Chang, S.-C.; Chen, K.-J.; SHI-CHUNG CHANG | IEEE International Symposium on Semiconductor Manufacturing Conference | 1 | 0 | |
2003 | Priority-Based Internet Access Control for Fairness Improvement and Abuse Reduction. | Lin, Tsung-Ching; Sun, Yeali S.; Chang, Shi-Chung; Chu, Shao-I; Chou, Yi-Ting; Li, Mei-Wen; SHI-CHUNG CHANG | Quality of Service in Multiservice IP Networks, Second International Workshop, QoS-IP 2003, Milano, Italy, February 24-26, 2003, Proceedings | 1 | 0 | |
2000 | Realizing dynamic manufacturing service provisioning mechanism in order commitment service | Chang, S.-C.; Guo, R.-S.; Su, Y.-H.; Lai, Y.-C.; SHI-CHUNG CHANG | IEEE International Symposium on Semiconductor Manufacturing Conference | | | |
2018 | Recurrent Reinforcement Learning for Predictive Overall Equipment Effectiveness | Liao D.-Y; Tsai W.-P; Chen H.-T; Ting Y.-P; Chen C.-Y; Chen H.-C; Chang S.-C.; SHI-CHUNG CHANG | e-Manufacturing and Design Collaboration Symposium 2018, eMDC 2018 - Proceedings | 3 | | |