公開日期 | 標題 | 作者 | 來源出版物 | scopus | WOS | 全文 |
1999 | Network Ready Semiconductor Manufacturing Cluster Tool | RUEY-SHAN GUO ; A. Chen; C. Weng; S. Chang; P. Chang; C. Liu; C. Lu; S. Lee,; H. Huang; S. Lu | Automation Technology Conference | | | |
1990 | On-line process optimization and control using the sequential design of experiments | Sachs E.; RUEY-SHAN GUO ; Ha S.; Hu A. | Digest of Technical Papers - Symposium on VLSI Technology | | | |
2005 | Optimal Ordering Policy by Considering the Tradeoff between Discount Vendor and Emergency Vendor | RUEY-SHAN GUO ; K. Chen; F. Pai; D. Chiang | The 6th Asia-Pacific Conference on Industrial Engineering and Management Systems | | | |
2012 | Optimal Pricing Strategies under Co-existence of Price-takers and Bargainers in a Supply Chain | RUEY-SHAN GUO ; CHIA-WEI KUO ; Wu, Ying-Fei | Journal of the Operational Research Society | 5 | 3 | |
2007 | Optimal supply chain configurations in semiconductor manufacturing | MING-HUANG CHIANG ; RUEY-SHAN GUO ; ARGON CHEN ; Cheng, Meng-Tse; Chen, Cheng-Bang | International Journal of Production Research | 15 | 15 | |
2002 | Optimization-based Available-to-Promise Allocation Model | RUEY-SHAN GUO ; J. Chen; D. Chiang | The 4th Asia-Pacific Conference on Industrial Engineering and Management Systems | | | |
2007 | Optimizing Fund Allocation by considering RAROC | 蔣明晃 ; 郭瑞祥 ; 陳佳滎 | INFORMS Annual Meeting Seattle 2007 | | | |
2020 | Parent-subsidiary linkage: How resource commitment and resource similarity influence firm performance | CHUNG-JEN CHEN ; Lin, Y.-H.; Wang, S.-H.; RUEY-SHAN GUO | Asia Pacific Journal of Management | 8 | 6 | |
2013 | Partner selection model for design chain collaboration | Chen J.-Y.; Chiang D.M.-H.; MING-HUANG CHIANG ; RUEY-SHAN GUO | International Journal of Production Research | 13 | 11 | |
2010 | Partner Selection Model for Green Design | RUEY-SHAN GUO ; D. Chiang,; J. Chen | The 11th Asia-Pacific Conference on Industrial Engineering and Management Systems | | | |
2005 | Pattern of vertical engineering collaboration between foundry and design service provider | Su, Y.-H.; Guo, R.-S. ; Hsiao, C.-H. | IEEE International Symposium on Semiconductor Manufacturing Conference Proceedings | 4 | | |
2004 | Patterns of Business Model Shift: A Historical Study on the SIP Providers | RUEY-SHAN GUO ; W. Hsieh; Y. Su | Innovation & Management Conference | | | |
2005 | Patterns of Horizontal Collaboration for Total Solution Service Provision in the IC Design Industry | RUEY-SHAN GUO ; Y. Chang; Y. Su | Tenth Annual Meeting of the Asia Pacific Decision Sciences Institute | | | |
2018 | Power Distance Diversification and Business Group Performance- a S Curve Hypotheses | C. Chen; R. Guo ; S. Wang; Y. Lin | | | | |
1990 | Process control system for VLSI fabrication | Sachs, Emanuel; Guo, Ruey-Shan ; Ha, Sungdo; Hu, Albert K. | The Electrochemical Society | 4 | | |
1991 | Process Control System for VLSI Fabrication | Sachs, E.; Guo, R.-S. ; Ha, S.; Hu, A. | IEEE Transactions on Semiconductor Manufacturing | 85 | 65 | |
2006 | A quadratic goal programming model and sensitivity analysis for semiconductor supply chain | Chiang, D.; Guo, R.-S.; Chen, A.; ARGON CHEN ; MING-HUANG CHIANG ; RUEY-SHAN GUO | IEEE International Symposium on Semiconductor Manufacturing Conference Proceedings | 0 | 0 | |
1997 | Real Competitiveness via Virtual Fab | RUEY-SHAN GUO ; T. Chou; Y. Lee; S. Chang; Y. Su | Technology Management Conference | | | |
2000 | Real-time equipment health evaluation and dynamic preventive maintenance | Chen, A.; Guo, R.-S. ; Wu, G.-S. | IEEE International Symposium on Semiconductor Manufacturing Conference | 10 | | |
1999 | Real-time Equipment Health Evaluation and Prognosis | RUEY-SHAN GUO ; G. Wu; A. Chen | 3rd Conference on Reliability and Maintainability | | | |