公開日期 | 標題 | 作者 | 來源出版物 | scopus | WOS | 全文 |
---|---|---|---|---|---|---|
2006 | Take-Or-Pay Supply Chain Contract under Market Price Volatility | David M. Chiang; Ruey-Shan Guo; Ming-Hsien Chen; Fan-Yun Pai; MING-HUANG CHIANG | 7th Asia-Pacific Conference on Industrial Engineering and Management System | |||
1992 | The Algorithms for Multi-item, Multi-period lot-siging Model with Maltiple Resources Constraints | 蔣明晃; MING-HUANG CHIANG | ORSA/TIMS Meeting | |||
1993 | The Algorithms for multi-level Single-end-item MRP problem | 蔣明晃; MING-HUANG CHIANG | ORSA/TIMS Meeting | |||
1998 | The Critical Issues of Global Logistics Operations in Hi-tech Industry at Taiwan | Chiang, David Ming-huang; MING-HUANG CHIANG | The 3rd International Conference on Global Logistics | |||
2008 | The Experimental Cross-campus WLAN Roaming System and WiMAX Integration in Taiwan | W.H.Huang; K.C.Tang; Z. Tsai; MING-HUANG CHIANG | IEICE APCC2008 | |||
2009 | The Final Order Model for Auto Service Parts Considering the End of Product Life Cycle | Ming-Huang Chiang; Ruey-Shan Guo; Yu-Shan Chen; Jia-Ying Chen; MING-HUANG CHIANG | 10th Asia-Pacific Conference on Industrial Engineering and Management Systems | |||
1995 | The Key Factors of Implementing an Successful OPS: An Empirical Study | Chiang, David Ming-huang; MING-HUANG CHIANG | ORSA/TIMS International Conference | |||
1996 | The Model of Performance Evaluation for an AS/RS System | Chiang, David Ming-huang; MING-HUANG CHIANG | ORSA/TIMS Conference | |||
2010 | The Optimal Services Level of Final Order for Auto Service Parts | Ruey-Shan Guo; Ming-Huang Chiang; Jia-Ying Chen; Chi-An Teng; MING-HUANG CHIANG | Joint Conference of The 4th International Conference on Operations and Supply Chain Management and | |||
2007 | The Relationship between Bargaining Power, Vendor Selection Practice and Performance in Semiconductor Supply Chain | Fan-Yun Pai; Ruey-Shan Guo; David M. Chiang; MING-HUANG CHIANG | 8th Asia-Pacific Conference on Industrial Engineering and Management System | |||
2002 | Using Decomposition Method to Solve Multi-Plant Production Planning and Scheduling Problem | David M. Chiang; Ruey-Shan Guo; Meng-Ching Lee; MING-HUANG CHIANG | Fourth Asia-Pacific Conference on Industrial Engineering and Management System | |||
2010 | Using order admission control to maximize revenue under capacity utilization requirements in MTO B2B industries | Wu A.; Chiang D.; Chang C.-W.; MING-HUANG CHIANG | Journal of the Operations Research Society of Japan | 7 | 0 | |
2007 | A WIP-based exception-management model for integrated circuit back-end production processes | Guo, Ruey-Shan ; Chiang, David M. ; Pai, Fan-Yun | International Journal of Advanced Manufacturing Technology | 12 | 9 | |
2000 | 企業導入企業資源規畫(ERP)套裝軟體之策略性目標與重要關鍵因素關係之研究 | 蔣明晃 | ||||
2002 | 供應鏈供需協調機制與決策支援模式 | 郭瑞祥(R. S. Guo) ; 蔣明晃(David. M. Chiang) ; 劉婉儀(W.I. Liu); 劉基全(J.C. Liou) | 臺大管理論叢 | 0 | 0 | |
2006 | 供應鏈雙佔結構下的品質競合決策 | 王志軒(Chih-Hsuan Wang); 郭瑞祥(R. S. Guo) ; 蔣明晃(David. M. Chiang) | 臺大管理論叢 | 0 | 0 | |
2005 | 半導體供應鏈多層級存貨監控機制 | 郭瑞祥; 蔣明晃; 莊貴惠; 楊博鈞; 劉基全; MING-HUANG CHIANG | Proceedings of CIIE | |||
2002 | 半導體供應鏈生產整合資源分配模式之研究 | 蔣明晃 | ||||
2005 | 半導體供應鏈網路需求與產能規劃整合模式之研究 | 蔣明晃 | ||||
2017 | 在信用擔保機制下供應具不確定性時之議價模式研究 | 蔣明晃(David Ming-Huang Chiang) ; 葉哲瑋(Che-Wei Yeh) | 管理學報 | 0 | 0 |