公開日期 | 標題 | 作者 | 來源出版物 | scopus | WOS | 全文 |
---|---|---|---|---|---|---|
2002 | Using Decomposition Method to Solve Multi-Plant Production Planning and Scheduling Problem | David M. Chiang; Ruey-Shan Guo; Meng-Ching Lee; MING-HUANG CHIANG | Fourth Asia-Pacific Conference on Industrial Engineering and Management System | |||
2010 | Using order admission control to maximize revenue under capacity utilization requirements in MTO B2B industries | Wu A.; Chiang D.; Chang C.-W.; MING-HUANG CHIANG | Journal of the Operations Research Society of Japan | 7 | 0 | |
2007 | A WIP-based exception-management model for integrated circuit back-end production processes | Guo, Ruey-Shan ; Chiang, David M. ; Pai, Fan-Yun | International Journal of Advanced Manufacturing Technology | 12 | 9 | |
2000 | 企業導入企業資源規畫(ERP)套裝軟體之策略性目標與重要關鍵因素關係之研究 | 蔣明晃 | ||||
2002 | 供應鏈供需協調機制與決策支援模式 | 郭瑞祥(R. S. Guo) ; 蔣明晃(David. M. Chiang) ; 劉婉儀(W.I. Liu); 劉基全(J.C. Liou) | 臺大管理論叢 | 0 | 0 | |
2006 | 供應鏈雙佔結構下的品質競合決策 | 王志軒(Chih-Hsuan Wang); 郭瑞祥(R. S. Guo) ; 蔣明晃(David. M. Chiang) | 臺大管理論叢 | 0 | 0 | |
2005 | 半導體供應鏈多層級存貨監控機制 | 郭瑞祥; 蔣明晃; 莊貴惠; 楊博鈞; 劉基全; MING-HUANG CHIANG | Proceedings of CIIE | |||
2002 | 半導體供應鏈生產整合資源分配模式之研究 | 蔣明晃 | ||||
2005 | 半導體供應鏈網路需求與產能規劃整合模式之研究 | 蔣明晃 | ||||
2017 | 在信用擔保機制下供應具不確定性時之議價模式研究 | 蔣明晃(David Ming-Huang Chiang) ; 葉哲瑋(Che-Wei Yeh) | 管理學報 | 0 | 0 | |
2004 | 多層上下游生產環境下多廠整合生產規劃模式之研究 | 蔣明晃 | ||||
2004 | 多廠生產規劃之供應鏈決策支援模式 | 郭瑞祥 ; 蔣明晃 ; 陳亞男; 劉基全 | 台大管理論叢 | 0 | 0 | |
2005 | 多重資源限制下之物料需求計劃 | 蔣明晃 | ||||
1993 | 多重資源限制下之物料需求計劃的研究 | 蔣明晃 | ||||
2007 | 委外保固契約下專業維修商服務時間最佳化之研究 | 蔣明晃 | ||||
2008 | 委外保固契約下維修代理商服務時間之最適化研究 | 陳彥年; 蔣明晃 | 臺大管理論叢 | 0 | 0 | |
2005 | 客製化延遲策略之最適生產配置量 | 郭瑞祥 ; 蔣明晃 ; 蔡家華; 白凡芸 | 台大工程學刊 | |||
1999 | 專案管理委外支援 策略規劃循序漸進 企業資源規劃套裝軟體市場簡介及導入指南 | 蔣明晃; 劉鳳如; MING-HUANG CHIANG | 會計研究月刊 | 0 | 0 | |
1999 | 常溫物流中心顧客服務要素與服務品質之研究 | 蔣明晃 | ||||
1999 | 引導流程再造 培養學習員工 建構合作鐵三角 我國企業導入ERP套裝軟體之現況與成功因素探討 | 蔣明晃; 劉鳳如; MING-HUANG CHIANG | 會計研究月刊 | 0 | 0 |