公開日期 | 標題 | 作者 | 來源出版物 | scopus | WOS | 全文 |
1995 | A method for logic design of ATM adaptation layer protocol | Hsu, Min-Chang; Chang, Shi-Chung | Computers and Communications, 1995. Conference Proceedings of the 1995 IEEE Fourteenth Annual International Phoenix Conference on | 0 | 0 | |
1988 | A Multiplier Method-Based Differential Dynamic Programming Algorithm | Chen, C. H.; 張時中; 馮蟻剛; Chang, Shi-Chung; Fong, I-Kong | Proceeding of the 1988 National Symposium on Automatic Control | | | |
1986 | ON THE COMPUTATION OF OPTIMAL STRATEGIES FOR LARGE SCALE CONTROL PROBLEMS. | Chang, Tsu-Shuan; Jin, Xiao-Xuan; Luh, Peter B.; Chang, Shi-Chung; SHI-CHUNG CHANG | IEEE Conference on Decision and Control | | | |
1992 | An Optimal Control Approach to Power Generation Scheduling Without Thermal Unit Dynamics | Liang, R. H.; 馮蟻剛; 張時中; Fong, I-Kong; Chang, Shi-Chung | Bulletin of the College of Engineering | | | |
1992 | Order and production scheduling rescheduling for flow shops | Chang, Shi-Chung; SHI-CHUNG CHANG | Robotics and Automation, 1992. Proceedings., 1992 IEEE International Conference on | 0 | 0 | |
1986 | PARALLEL ALGORITHM FOR TEMPORAL DECOMPOSITION OF LONG HORIZON OPTIMAL CONTROL PROBLEMS. | Chang, Shi-Chung; Luh, Peter B.; Chang, Tsu-Shuan; SHI-CHUNG CHANG | IEEE Conference on Decision and Control | | | |
1989 | Parallel algorithm for the time decomposition approach to constrained optimal control problems | Chang, Shi-Chung; Chen, Chun-Hung; Fong, I-Kong; SHI-CHUNG CHANG | | | | |
1989 | A Parallel Algorithm for the Time Decomposition Approach to Constrained Optimal Control Problems | 張時中; Chen, C. H.; 馮蟻剛; Chang, Shi-Chung; Fong, I-Kong | Proceedings of the 1989 American Control Conference | | | |
1990 | Parallel Algorithms for Long Horizon Dynamic Optimization and Their Applications | Chang, Shi-Chung; Fong, I-Kong | | | | |
1989 | A Parallel Optimal Control Algorithm Based on Spatial Decomposition and Coordination | 張時中; Kuo, M. Y.; 馮蟻剛; Chang, Shi-Chung; Fong, I-Kong | Proceeding of the 1989 National Symposium on Automatic Control | | | |
1988 | Parallel two-level algorithm for constrained optimal control | Shi, Jian; Luh, Peter B.; Chang, Shi-Chung; Chang, Tsu-Shuan; SHI-CHUNG CHANG | IEEE Conference on Decision and Control | | | |
2008 | Payment Cost Minimization Auction for Deregulated Electricity Markets With Transmission Capacity Constraints | Zhao, Feng; Luh, Peter B.; Yan, Joseph H.; Stern, Gary A.; Chang, Shi-Chung | IEEE Transactions on Power Systems | | | |
1995 | Performance evaluation of a cache-coherent multi-processor by iterative mean value analysis | Huang, Chien-Yuan; Chang, Shi-Chung; Chen, Chern-Lin | Performance Evaluation | | | |
1997 | PHOMAG: a photolithography machine allocation game | Chang, Shi-Chung; Liu, Chung-Yang; Hu, Ming-Der; Wu, Hsin-Yi; Wu, Hsin-Chen; Chao, Cheng-Lin; Chen, Ren-Cheng | Semiconductor Manufacturing Conference Proceedings, 1997 IEEE International Symposium on | 0 | 0 | |
2003 | Priority-Based Internet Access Control for Fairness Improvement and Abuse Reduction. | Lin, Tsung-Ching; Sun, Yeali S.; Chang, Shi-Chung; Chu, Shao-I; Chou, Yi-Ting; Li, Mei-Wen; SHI-CHUNG CHANG | Quality of Service in Multiservice IP Networks, Second International Workshop, QoS-IP 2003, Milano, Italy, February 24-26, 2003, Proceedings | 1 | 0 | |
2000 | Realizing dynamic manufacturing service provisioning mechanism in order commitment service | Chang, Shi-Chung; Guo, Ruey-Shan ; Su, Yea-Huey; Lai, Yi-Chang | The Ninth International Symposium on Semiconductor Manufacturing, 2000 | 2 | 0 | |
2007 | Reverse auction-based job assignment among foundry fabs | Chang, Shi-Chung; Hsieh, Ming-Ming; Chen, Chia-Wei | International Journal of Production Research | | | |
1991 | Scheduling flexible flow shops of no setup cost by a Lagrangian relaxation and network flow approach | Chang, Shi-Chung; Liao, Da-Yin; Hsieh, Fu-Shiung; SHI-CHUNG CHANG | IEEE International Conference on Robotics and Automation | | | |
1991 | Scheduling flexible flow shops of no setup cost by a Lagrangian relaxation and network flow approach | Chang, Shi-Chung; Liao, Da-Yin; Hsieh, Fu-Shiung | Robotics and Automation, 1991. Proceedings., 1991 IEEE International Conference on | 0 | 0 | |
1992 | Scheduling flexible flow shops with no setup effects | Chang, Shi-Chung; SHI-CHUNG CHANG | Robotics and Automation, 1992. Proceedings., 1992 IEEE International Conference on | 0 | 0 | |