公開日期 | 標題 | 作者 | 來源出版物 | scopus | WOS | 全文 |
2000 | Realizing dynamic manufacturing service provisioning mechanism in order commitment service | Chang, Shi-Chung; Guo, Ruey-Shan ; Su, Yea-Huey; Lai, Yi-Chang | The Ninth International Symposium on Semiconductor Manufacturing, 2000 | 2 | 0 | |
2007 | Reverse auction-based job assignment among foundry fabs | Chang, Shi-Chung; Hsieh, Ming-Ming; Chen, Chia-Wei | International Journal of Production Research | | | |
1991 | Scheduling flexible flow shops of no setup cost by a Lagrangian relaxation and network flow approach | Chang, Shi-Chung; Liao, Da-Yin; Hsieh, Fu-Shiung; SHI-CHUNG CHANG | IEEE International Conference on Robotics and Automation | | | |
1991 | Scheduling flexible flow shops of no setup cost by a Lagrangian relaxation and network flow approach | Chang, Shi-Chung; Liao, Da-Yin; Hsieh, Fu-Shiung | Robotics and Automation, 1991. Proceedings., 1991 IEEE International Conference on | 0 | 0 | |
1992 | Scheduling flexible flow shops with no setup effects | Chang, Shi-Chung; SHI-CHUNG CHANG | Robotics and Automation, 1992. Proceedings., 1992 IEEE International Conference on | 0 | 0 | |
1991 | Sensitivity Analysis and Parallel Algorithm Development for Large-Scale Optimal Control Problems | Chang, Shi-Chung; Fong, I-Kong | | | | |
1990 | The Sensitivity Analysis of Optimal Control Problems and Its Application | Yang, W. L.; 張時中; 馮蟻剛; Chang, Shi-Chung; Fong, I-Kong | Proceeding of the 1990 National Symposium on Automatic Control | | | |
2000 | SHEWMA: an End-of-line SPC Scheme Using Wafer Acceptance Test Data | Fan, Chih-Min; Guo, Ruey-Shan ; Chang, Shi-Chung; SHI-CHUNG CHANG | IEEE Transactions on Semiconductor Manufacturing | 16 | 13 | |
1984 | Solutions and properties of multi-stage stackelberg games. | Luh, Peter B.; Chang, Shi-Chung; Chang, Tsu-Shuan; SHI-CHUNG CHANG | Automatica | 18 | 16 | |
1984 | STACKELBERG GAME APPROACH TO POWER SYSTEM SCHEDULING PROBLEMS. | Chang, Shi-Chung; Luh, Peter B.; Chang, Tsu-Shuan; SHI-CHUNG CHANG | American Control Conference | | | |
1987 | STOCHASTIC TASK SELECTION AND RENEWABLE RESOURCE ALLOCATION. | Luh, Peter B.; Miao, Xi-Yi; Chang, Shi-Chung; Castanon, David A.; SHI-CHUNG CHANG | American Control Conference | | | |
1994 | Studies of Fused-Taper Six-Portl Optical Fiber Couplers | 張宏鈞 ; Wu, C. W.; 張時中; Liao, G. J.; Huang, C. K.; Chang, Hung-Chun ; Chang, Shi-Chung | | | | |
- | Task 879.1: Intelligent Demand Aggregation and Forecasting | Chen, Argon; Guo, Ruey-Shan; Chang, Shi-Chung | | | | |
1998 | Translating output specifications to production flow requirements for re-entrant lines | Hu, Ming-Der; Chang, Shi-Chung | Decision and Control, 1998. Proceedings of the 37th IEEE Conference on | 0 | 0 | |
2006 | Transportation and HVAC Systems for Building Emergency Evacuation. | See, Andrew; Michel, Laurent D.; Xiong, Bo; Luh, Peter B.; Chang, Shi-Chung; SHI-CHUNG CHANG | 2006 IEEE International Conference on Automation Science and Engineering, Shanghai, China, 7-10 October 2006 | 1 | 0 | |
1990 | Transrectal Sonographic Cysto-Urethrography:Studies in Stress Urinary Incontinence | Chang, Hong-Chiang; Kuo, Hann-Chrong; 張宏江; Chang, Shi-Chung; Tsai, Tsong-Chang | Urology | | | |
1998 | TSS: a daily production target setting system for fabs | Wu, Guan-Liang; Wei, Kang; Tsai, Chih-Yang; Chang, Shi-Chung; Wang, Nan-Jye; Tsai, Rong-Long; SHI-CHUNG CHANG | Semiconductor Manufacturing Technology Workshop | 3 | 0 | |
1993 | Two Effective Approaches for Hydroelectric Generation Scheduling | 張時中; Yang, W. L.; 馮蟻剛; Chen, C. H.; Chang, Shi-Chung; Fong, I-Kong | Journal of Chinese Institute Engineers | | | |
1990 | Two Effective Approaches for Hydroelectric Generation Scheduling | 張時中; Yang, W. L.; 馮蟻剛; Chen, C. H.; Chang, Shi-Chung; Fong, I-Kong | The 9th International Conference on Analysis and Optimization of Systems, Antibes, France(1990.07) | | | |
1989 | Two Effective Approaches for Hydroelectric Generation Scheduling Problem | 張時中; Yang, W. L.; 馮蟻剛; Chen, C. H.; Chang, Shi-Chung; Fong, I-Kong | | | | |