公開日期 | 標題 | 作者 | 來源出版物 | scopus | WOS | 全文 |
2001 | 2001 deliverable report: intelligent multidimensional demand aggregation/disaggregation strategies | Chang, Shi-Chung; Hsu, Chia-Hau; Cheng, Yee-Chiu; Chen, Argon ; Guo, Ruey-Shan | | | | |
2002 | 2002 deliverable report: forecasting methodologies for multidimensional aggregated demands | Chen, Argon ; Guo, Ruey-Shan ; Chang, Shi-Chung; Chen, Kenk; Hsia, Ziv; Lan, Jakey | | | | |
2003 | 2003 deliverable report: forecasting methodologies for multidimensional aggregated demands | Chen, Argon ; Guo, Ruey-Shan ; Chang, Shi-Chung; Huang, Tonny; Yang, Kyle; Tzeng, Janet | | | | |
1990 | A method for constrained dynamic optimization problems | Shi, Jian; Luh, Peter B.; Chang, Shi-Chung; Chang, Tsu-Shuan; SHI-CHUNG CHANG | American Control Conference | | | |
1995 | Analysis of proportional machine allocation scheme in a deterministic reentrant line | Chang, Shi-Chung; Jan, Wen-Lin; Wang, Tza-Huei; Chang, Cheng-Shang; SHI-CHUNG CHANG | IEEE Symposium on Emerging Technologies & Factory Automation | | | |
1995 | Analysis of proportional machine allocation scheme in a deterministic reentrant line | Chang, Shi-Chung; Jan, Wen-Lin; Wang, Tza-Huei; Chang, Cheng-Shang | Emerging Technologies and Factory Automation, 1995. ETFA '95 | 0 | 0 | |
1997 | ATM轉換層之設計(1/3) | 張時中; Chang, Shi-Chung | | | | |
1994 | ATM轉換層之設計(1/3) | 闕志達 ; 張時中; Chiueh, Tzi-Dar ; Chang, Shi-Chung | | | | |
2005 | Configuration, monitoring and control of semiconductor supply chains | Chang, Shi-Chung; Chen, Argon ; Chou, Yon | | | | |
1993 | Daily scheduling for R&D semiconductor fabrication | Liao, Da-Yin; Chang, Shi-Chung; Yen, Shou-Ren; SHI-CHUNG CHANG | Robotics and Automation, 1993. Proceedings., 1993 IEEE International Conference on | 0 | 0 | |
1993 | Daily scheduling for R&D semiconductor fabrication | Liao, Da-Yin; Chang, Shi-Chung; Yen, Shou-Ren; Chien, Cheng-Chung; SHI-CHUNG CHANG | IEEE International Conference on Robotics and Automation | | | |
1999 | Demand-Driven, Iterative Capacity Allocation and Cycle Time Estimation for Re-entrant Lines | Chang, Shi-Chung | | | | |
2005 | Design of Collaborative Engineering Data System (CEDS): an application case of process integration | Fan, Chih-Min; Chang, Shi-Chung; Chang, Henry | Semiconductor Manufacturing, 2005. ISSM 2005, IEEE International Symposium on | 0 | 0 | |
1995 | Design, implementation, and applications of a B-ISDN simulation testbed | Chang, Jin-Fu; Chang, Shi-Chung; Tsai, Zsehong; Wu, Jung-Shyr; SHI-CHUNG CHANG ; ZSEHONG TSAI | 28th Annual Simulation Symposium, 1995 | 1 | 0 | |
2016 | Double Auction Design for Short-Interval and Heterogeneous Spectrum Sharing. | Zhan, Shun-Cheng; Chang, Shi-Chung; SHI-CHUNG CHANG | IEEE Trans. Cogn. Comm. & Networking | 0 | 0 | |
2001 | Dynamic scheduling rule selection for semiconductor wafer fabrication | Hsieh, Bo-Wei; Chang, Shi-Chung; SHI-CHUNG CHANG | Robotics and Automation, 2001. Proceedings 2001 ICRA. IEEE International Conference on | 0 | 0 | |
1989 | An Effective Differential Dynamic Programming Algorithm for Constrained Optimal Control Problems | Chen, C. H.; 張時中; 馮蟻剛; Chang, Shi-Chung; Fong, I-Kong | Proceeding of the 1989 American Control Conference | | | |
1989 | Effective differential dynamic programming algorithm for constrained optimal control problems | Chen, Chun-Hung; Chang, Shi-Chung; Fong, I-Kong; SHI-CHUNG CHANG | | | | |
2003 | Efficient selection of scheduling rule combination by combining design of experiment and ordinal optimization-based simulation | Hsieh, Bo-Wei; Chang, Shi-Chung; Chen, Chun-Hung | Robotics and Automation, 2003. Proceedings. ICRA '03. IEEE International Conference on | | | |
2003 | Efficient Selection of Scheduling Rule Combination by Combining Design of Experiment and Ordinal Optimization-Based Simulation. | Hsieh, Bo-Wei; Chang, Shi-Chung; Chen, Chun-Hung; SHI-CHUNG CHANG | Proceedings of the 2003 IEEE International Conference on Robotics and Automation, ICRA 2003, September 14-19, 2003, Taipei, Taiwan | 0 | 0 | |