公開日期 | 標題 | 作者 | 來源出版物 | scopus | WOS | 全文 |
---|---|---|---|---|---|---|
2002 | A Component Commonality-based Material Planning Model for the Assembly Industry | RUEY-SHAN GUO ; M. Yu; D. Chiang | The 4th Asia-Pacific Conference on Industrial Engineering and Management Systems | |||
2009 | A Design Partner Selection Model for Design Chain Collaboration | RUEY-SHAN GUO ; D. Chiang; J. Chen | 2009 INFORMS Annual Meeting | |||
2012 | An Optimal Pricing Policy of Manufacturer by Considering both Consignee and Production of Distributor in Green Supply Chain | RUEY-SHAN GUO ; Y. Lin; J. Chen; D. Chiang | International Conference on Operations and Supply Chain Management | |||
2011 | An Optimal Subsidy Policy of Government by Considering Green Market Size and Consumer Valuations for Remanufactured Products | RUEY-SHAN GUO ; J. Hsu; J. Chen; D. Chiang | International Conference on Operations and Supply Chain Management | |||
2007 | “Cooperative Buyer-Vendor Relationships for Custom Integrated Circuits Manufacturing,” | RUEY-SHAN GUO ; D. Chiang; R. Guo,; F. Pai | 2007 The 8th Asia-Pacific Conference on Industrial Engineering and Management Systems | |||
2005 | Coordinated Multi-plant Production Planning in a Multi-echelon Production Environment Considering Alternative Route | RUEY-SHAN GUO ; H. Lee; J. Liou; D. Chiang | The 6th Asia-Pacific Conference on Industrial Engineering and Management Systems | |||
2007 | Customer Satisfaction Improvement with a Hybrid Dispatching Rule in Semiconductor Back-end Factories | RUEY-SHAN GUO ; D. Chiang; F. Pai | Annual meeting of Academy of Management | |||
2009 | Dynamic Performance Evaluation for Healthcare Service Innovation – A Case Study for PCA Program at NTUH | RUEY-SHAN GUO ; J. Chen; R. Tsao; D. Chiang; J. Yu | The 10th Asia-Pacific Conference on Industrial Engineering and Management Systems | |||
2014 | Efficient multi-node optimal placement for decoupling capacitors on PCB | S.-Y. Huang; Y.-S. Cheng; C.-Y. Huang; B. Liu; S. Chang; D. Chiang; P. Gu; R.-B. Wu; RUEY-BEEI WU | IEEE 18th Workshop on Signal and Power Integrity (SPI) | 7 | 0 | |
2007 | Monitoring and Control of Echelon Inventory in Semiconductor Manufacturing | RUEY-SHAN GUO ; D. Chiang | International Conference on Operations and Supply Chain Management | |||
2006 | Monitoring Semiconductor Supply Chain based on Echelon WIP Inventory and CONWIP System | RUEY-SHAN GUO ; L. Yang; D. Chiang | The 7th Asia-Pacific Conference on Industrial Engineering and Management Systems | |||
2005 | Optimal Ordering Policy by Considering the Tradeoff between Discount Vendor and Emergency Vendor | RUEY-SHAN GUO ; K. Chen; F. Pai; D. Chiang | The 6th Asia-Pacific Conference on Industrial Engineering and Management Systems | |||
2002 | Optimization-based Available-to-Promise Allocation Model | RUEY-SHAN GUO ; J. Chen; D. Chiang | The 4th Asia-Pacific Conference on Industrial Engineering and Management Systems | |||
2005 | Robust Supply Chain Configurations in Semiconductor Manufacturing | RUEY-SHAN GUO ; A. Chen; D. Chiang | International Conference on Modeling and Analysis of Semiconductor Manufacturing | |||
2005 | Semiconductor Supply Chain Monitoring Schemes for Echelon WIP Inventory | RUEY-SHAN GUO ; J. Liou; L. Yang,; K. Chuang; D. Chiang | Chinese Industrial Engineering Conference | |||
2006 | Semiconductor Supply Chain Monitoring Schemes for Echelon WIP Inventory Using CONWIP Concept | RUEY-SHAN GUO ; L. Yang; D. Chiang | Chinese Industrial Engineering Conference | |||
2006 | Sensitivity Analysis of a Quadratic Goal Programming Model for Semiconductor Supply Chain | RUEY-SHAN GUO ; C. Chen; A. Chen; D. Chiang | Chinese Industrial Engineering Conference | |||
2007 | Stochastic Modeling and Validation of Inter-purchase Time for Customer Relationship Management | RUEY-SHAN GUO ; J. Chen; Y. Chen,; D. Chiang | The 8th Asia-Pacific Conference on Industrial Engineering and Management Systems | |||
2008 | Supply Chain Integration and its Determinants | RUEY-SHAN GUO ; D. Chiang; F. Pai | 2008 Annual meeting of Academy of Management | |||
2005 | Supply Chain Production Planning Problem with Occupied Material | RUEY-SHAN GUO ; D. Chiang; J. Liou | The 6th Asia-Pacific Conference on Industrial Engineering and Management Systems |