公開日期 | 標題 | 作者 | 來源出版物 | scopus | WOS | 全文 |
2001 | Analysis of cycle excavation and productivity of large-scale rock tunnel projects - Lesson learned in Taiwan | Guo, S.-J.; SY-JYE GUO | Canadian Journal of Civil Engineering | | | |
2015 | Analysis on thermal hazard of foam decoration materials | Guo, S.-J.; Tsai, H.-F.; SY-JYE GUO | Advances in Materials Science and Engineering | | | |
2013 | The application of mep systems installation for interface integration in building construction | Guo, S.-J.; Tai, C.-S.; Chen, H.-C.; SY-JYE GUO | Journal of Marine Science and Technology | | | |
2014 | An application of space syntax to critical working space Analysis: The case of building construction | Wu, L.-W.; Guo, S.-J.; SY-JYE GUO | Journal of Marine Science and Technology | | | |
2017 | BIM Techniques for Investigating Green Roof Feasibility: Case Study at National Taiwan University [基于BIM技術的綠屋頂可行性研究: 以台大資工館為例] | Wei, T.-B.; Guo, S.-J.; Kuo, H.-J.; Chou, K.-Y.; SY-JYE GUO | Journal of the Chinese Institute of Civil and Hydraulic Engineering | | | |
2020 | CO multi-forecasting model for indoor health and safety management in smart home | Chang, C.-Y.; Ko, K.-S.; Guo, S.-J.; Hung, S.-S.; Lin, Y.-T.; SY-JYE GUO | Journal of Internet Technology | | 1 | |
2011 | Construction project management and insurance program for Taiwan high speed rail project | Lu, I.-F.; Guo, S.-J.; Pan, Y.-J.; SY-JYE GUO | Leadership and Management in Engineering | | | |
2016 | Cost-effective energy saving measures based on BIM technology: Case study at National Taiwan University | Guo, S.-J.; Wei, T.; SY-JYE GUO | Energy and Buildings | | | |
2012 | Development of a cost predicting model for maintenance of university buildings | Li, C.-S.; Guo, S.-J.; SY-JYE GUO | Advances in Intelligent and Soft Computing | | | |
2016 | The Development of a diagnostic model for the deterioration of external wall tiles of aged buildings in Taiwan | Chiang, L.-W.; Guo, S.-J.; Chang, C.-Y.; Lo, T.-P.; SY-JYE GUO | Journal of Asian Architecture and Building Engineering | | | |
2017 | Empirical research on BIM application for cost estimation of HVAC system in buildings | Guo, S.-J.; Chiang, L.-W.; Chong, U.-O.; Chen, J.-Y.; SY-JYE GUO | 34th International Symposium on Automation and Robotics in Construction | | | |
2012 | Fire and thermal hazard analyses of industrial zeolite catalysis for phenol production | Tsai, H.-F.; Guo, S.-J.; Wu, S.-H.; SY-JYE GUO | Advanced Materials Research | | | |
2017 | Fuzzy duration forecast model for wind turbine construction project subject to the impact of wind uncertainty | Guo, S.-J.; Chen, J.-H.; Chiu, C.-H.; SY-JYE GUO | Automation in Construction | | | |
1996 | A generic cost-concern matrix for identifying automation needs in construction | Guo, S.-J.; Tucker, R.L.; SY-JYE GUO | Automation in Construction | | | |
2002 | Identification and resolution of work space conflicts in building construction | Guo, S.-J.; SY-JYE GUO | Journal of Construction Engineering and Management | | | |
2007 | Medical records for building health management | Chang, C.-Y.; Huang, S.-M.; Guo, S.-J.; SY-JYE GUO | Journal of Architectural Engineering | | | |
2017 | Schedule planning model for onshore wind turbine construction project subjected to the impact of wind [陸上風力發電機組興建工程受風不確定性因素影響之工期預測模式] | Guo, S.-J.; Chen, J.-H.; Chiu, C.-H.; SY-JYE GUO | Journal of the Chinese Institute of Civil and Hydraulic Engineering | | | |