公開日期 | 標題 | 作者 | 來源出版物 | scopus | WOS | 全文 |
---|---|---|---|---|---|---|
2009 | A Design Partner Selection Model for Design Chain Collaboration | Jia-Ying Chen; Ruey-Shan Guo; David Ming Huang Chiang; MING-HUANG CHIANG | INFORMS meeting | |||
2009 | Dynamic Performance Evaluation System for Patient Controlled Analgesia Program | Jiun-Yu Yu; Ruey-Shan Guo; Ming-Huang Chiang; Jo-Lin; Jia-Ying Chen; MING-HUANG CHIANG | 10th Asia-Pacific Conference on Industrial Engineering and Management Systems | |||
2010 | Partner Selection Model for Green Design | Ming-Huang Chiang; Ruey-Shan Guo; Jia-Ying Chen; MING-HUANG CHIANG | 11th Asia-Pacific Conference on Industrial Engineering and Management System | |||
2007 | Stochastic Modeling and Validation of Inter-Purchase Time for Customer | Ruey-Shan Guo; David M. Chiang; Yi-Fen Chen; Jia-Ying Chen; MING-HUANG CHIANG | 8th Asia-Pacific Conference on Industrial Engineering and Management System | |||
2009 | The Final Order Model for Auto Service Parts Considering the End of Product Life Cycle | Ming-Huang Chiang; Ruey-Shan Guo; Yu-Shan Chen; Jia-Ying Chen; MING-HUANG CHIANG | 10th Asia-Pacific Conference on Industrial Engineering and Management Systems | |||
2010 | The Optimal Services Level of Final Order for Auto Service Parts | Ruey-Shan Guo; Ming-Huang Chiang; Jia-Ying Chen; Chi-An Teng; MING-HUANG CHIANG | Joint Conference of The 4th International Conference on Operations and Supply Chain Management and |