Effects of Wind on Schedule Planning for Onshore Wind Turbine Generator Construction Project

Date Issued
2014
Date
2014
Author(s)
Chiu, Chia-Hsin
URI
http://ntur.lib.ntu.edu.tw//handle/246246/260857
Abstract
Taiwan has good wind conditions to generate electricity. Although, in traditional forecasting, the duration has already taken the weather factors into consideration, this way may still cause errors. Therefore, this study uses the expert questionnaire by whom has been involved in the construction of wind turbine engineering in Taiwan. By using fuzzy theory, the study draws trapezoidal membership functions dealing with questionnaire fuzzy semantic. With historical wind data and the above parameters, this study establishes Project Scheduling Assistant System Considering Wind Impact of Onshore Wind Turbine Generator Construction. Through the assistant system, this study simulates the duration of activities which suffer greater impact from wind of the case “Taoyuan Luzhu Wind Turbine Generator Construction” under different wind conditions; then sum up all durations of the activities between activity "wind turbines on-site installation" and "96 hours of continuous operation test". By using the Project Scheduling Assistant System and the historical wind data of Xinwu from 2008 to 2013, this study simulates the duration caused by different circumstances. The result shows that if the wind speed is relatively small, the activities "wind turbines on-site installation" and "wind turbines wiring" will be completed in a shorter duration. Conversely, the activities "wind turbines test"," wind turbines functional test" and "96 hours of continuous operation test" require large wind speed. Another simulation is given a new start time in different years and in different months as the beginning of the installation of wind turbines. The result shows that starting on July 27th does make the total duration the shortest.
Subjects
工期預估
陸上風力發電機組工程
排程輔助系統
風力發電
排程規劃
Type
thesis
File(s)
Loading...
Thumbnail Image
Name

ntu-103-R01521703-1.pdf

Size

23.32 KB

Format

Adobe PDF

Checksum

(MD5):7565909a38fd46d0f1db5f41b6dfa40f

臺大位居世界頂尖大學之列,為永久珍藏及向國際展現本校豐碩的研究成果及學術能量,圖書館整合機構典藏(NTUR)與學術庫(AH)不同功能平台,成為臺大學術典藏NTU scholars。期能整合研究能量、促進交流合作、保存學術產出、推廣研究成果。

To permanently archive and promote researcher profiles and scholarly works, Library integrates the services of “NTU Repository” with “Academic Hub” to form NTU Scholars.

總館學科館員 (Main Library)
醫學圖書館學科館員 (Medical Library)
社會科學院辜振甫紀念圖書館學科館員 (Social Sciences Library)

開放取用是從使用者角度提升資訊取用性的社會運動,應用在學術研究上是透過將研究著作公開供使用者自由取閱,以促進學術傳播及因應期刊訂購費用逐年攀升。同時可加速研究發展、提升研究影響力,NTU Scholars即為本校的開放取用典藏(OA Archive)平台。(點選深入了解OA)

  • 請確認所上傳的全文是原創的內容,若該文件包含部分內容的版權非匯入者所有,或由第三方贊助與合作完成,請確認該版權所有者及第三方同意提供此授權。
    Please represent that the submission is your original work, and that you have the right to grant the rights to upload.
  • 若欲上傳已出版的全文電子檔,可使用Open policy finder網站查詢,以確認出版單位之版權政策。
    Please use Open policy finder to find a summary of permissions that are normally given as part of each publisher's copyright transfer agreement.
  • 網站簡介 (Quickstart Guide)
  • 使用手冊 (Instruction Manual)
  • 線上預約服務 (Booking Service)
  • 方案一:臺灣大學計算機中心帳號登入
    (With C&INC Email Account)
  • 方案二:ORCID帳號登入 (With ORCID)
  • 方案一:定期更新ORCID者,以ID匯入 (Search for identifier (ORCID))
  • 方案二:自行建檔 (Default mode Submission)
  • 方案三:學科館員協助匯入 (Email worklist to subject librarians)

Built with DSpace-CRIS software - Extension maintained and optimized by 4Science