Modularization and assembly algorithm for efficient MEP construction
Resource
Automation in Construction, 20(7), 837-863
Journal
Automation in Construction
Pages
837-863
Date Issued
2011
Date
2011
Author(s)
Abstract
This paper presents an algorithm for efficiently designing, fabricating, and constructing the mechanical, electrical, and plumbing (MEP) systems for buildings. MEP facility construction presents numerous challenges related to its complexity, space limitations, and interference with other trades working in confined areas. Besides, schedule delays can easily be caused by the uncontrolled delivery schedule of the components. This research provides a rational planning algorithm which packages large and complex MEP systems into several smaller fabricated components using spatial planning algorithms to increase the efficiency of the installation process, create a safer work environment, improve construction quality and productivity, reduce construction cycle time, and minimize cost. Furthermore, the technique is verified and validated by three experts and a case study is presented to demonstrate the effectiveness of this algorithm. © 2011 Elsevier B.V. All rights reserved.
Type
journal article
File(s)![Thumbnail Image]()
Loading...
Name
81.pdf
Size
23.23 KB
Format
Adobe PDF
Checksum
(MD5):ff22a3fa4c2fe4ddf6a160659c688518