The Study of Design Interface Integration Process Improvement in Construction Project Engineering-A Case Study of Cogeneration Plant Construction Project
Date Issued
2014
Date
2014
Author(s)
Chen, Hung-Ming
Abstract
In the construction engineering project, due to the various engineering types and the system complexity to produce many engineering interface in design and construction stage. During the construction stage is often because they do not complete the integration of interface design, to result the field construction problems and delayed the construction period and the increase in construction costs, and the overall duration and quality is affected. To improve this situation, this study will explore the design integration process steps, via the case by collecting the interference problems arising from constructed engineering project, to collate and analyze existing problem, and explore the lack of original design integration process to seek a suitable process steps, the new design incorporates key index of steps to improve the design of integrated management efficiency, and new construction projects of a practical project case studies designed to explore and validate the integration process.
This study will be divided into three stages , the first stage of the design process to probe in order to understand the interface between the design departments, and the second phase of construction problems investigate the reasons summarized by collecting cases seeking control indicator issues, improve system works interface design integration process, and the third stage is the integration of this new design key index steps set into the construction works in construction cases validated to confirm its feasibility.
Due to the various construction engineering types and its system complexity and systems engineering interface is multiple, design management need to rely on experienced engineers. In this study, these experiences will be methodized and logical. Interface design through improved integration of systems engineering processes. Construction often face the problem that can be resolved, so frequently occurring changes designed to avoid interference problems of conflict, then schedule and project quality can be achieved the wanted target.
Subjects
設計界面
設計整合
關鍵指標