Repository logo
  • English
  • 中文
Log In
Have you forgotten your password?
  1. Home
  2. College of Engineering / 工學院
  3. Civil Engineering / 土木工程學系
  4. Deformation Behavior of Diaphragm Wall of a Deep Excavation Case in Luzhou Area
 
  • Details

Deformation Behavior of Diaphragm Wall of a Deep Excavation Case in Luzhou Area

Date Issued
2008
Date
2008
Author(s)
Wen, Ting-Rui
URI
http://ntur.lib.ntu.edu.tw//handle/246246/187592
Abstract
This study selected a deep excavation case in Luzhou area to investigate the deformation behavior of diaphragm wall during the whole process of construction. By using the data measured from inclinometers buried in the wall and strain gages installed on the strut, the history of load~deformation of diaphragm during various stages of construction can be thoroughly investigated. During the period of ground improvement before the excavation, the wall experienced significant outward displacement by jet grouting. The maximum deformation occurred at the depth near the top of grouting area. After the grouting, the wall deformation would rebound gradually with time. During the process of braced excavation, the total deformations of wall at each stage of excavation can be separated into four parts, resulted from the periods of standing-by(P1), excavating soils(P2), installing struts(P3) and preloading of struts(P4), respectively. At P1 stage, there is likely an increasing trend of wall movements and the strut loads remain unchanged. At P2 stage, the maximum displacement usually occurs below the excavation surface and the strut load is increased accordingly. At P3 stage, the wall deflection will increase continuously with time. Due to the effect of preload in P4 stage, the wall will move inwardly and the loads at upper struts will decrease simultaneously. The results of back analysis demonstrate that the estimated earth pressures deduced from the strut loads are larger than the theoretically predicted values. The leakage of water from wall surface caused the wall deformation and strut load increased immediately. Then the action of water refilling slows down the wall deformation and provides lateral support simultaneously. However the actions of seal-off grouting will result the increase of wall deformation and strut load. By simplification analysis, the pressure on the wall due to grouting is estimated to be around 1/6 of the grouting pressure.
Subjects
deep excavation
wall deformation
strut load
earth pressure
Type
thesis
File(s)
Loading...
Thumbnail Image
Name

ntu-97-R95521102-1.pdf

Size

23.32 KB

Format

Adobe PDF

Checksum

(MD5):9368e5d68f6f24d511ab6d20f10028f8

臺大位居世界頂尖大學之列,為永久珍藏及向國際展現本校豐碩的研究成果及學術能量,圖書館整合機構典藏(NTUR)與學術庫(AH)不同功能平台,成為臺大學術典藏NTU scholars。期能整合研究能量、促進交流合作、保存學術產出、推廣研究成果。

To permanently archive and promote researcher profiles and scholarly works, Library integrates the services of “NTU Repository” with “Academic Hub” to form NTU Scholars.

總館學科館員 (Main Library)
醫學圖書館學科館員 (Medical Library)
社會科學院辜振甫紀念圖書館學科館員 (Social Sciences Library)

開放取用是從使用者角度提升資訊取用性的社會運動,應用在學術研究上是透過將研究著作公開供使用者自由取閱,以促進學術傳播及因應期刊訂購費用逐年攀升。同時可加速研究發展、提升研究影響力,NTU Scholars即為本校的開放取用典藏(OA Archive)平台。(點選深入了解OA)

  • 請確認所上傳的全文是原創的內容,若該文件包含部分內容的版權非匯入者所有,或由第三方贊助與合作完成,請確認該版權所有者及第三方同意提供此授權。
    Please represent that the submission is your original work, and that you have the right to grant the rights to upload.
  • 若欲上傳已出版的全文電子檔,可使用Open policy finder網站查詢,以確認出版單位之版權政策。
    Please use Open policy finder to find a summary of permissions that are normally given as part of each publisher's copyright transfer agreement.
  • 網站簡介 (Quickstart Guide)
  • 使用手冊 (Instruction Manual)
  • 線上預約服務 (Booking Service)
  • 方案一:臺灣大學計算機中心帳號登入
    (With C&INC Email Account)
  • 方案二:ORCID帳號登入 (With ORCID)
  • 方案一:定期更新ORCID者,以ID匯入 (Search for identifier (ORCID))
  • 方案二:自行建檔 (Default mode Submission)
  • 方案三:學科館員協助匯入 (Email worklist to subject librarians)

Built with DSpace-CRIS software - Extension maintained and optimized by 4Science