『Research on Schedule Control of High-Tech Plants Construction - Taking the 12-inch Wafer Plants in the Southern Taiwan Science Park for Example。』
Date Issued
2014
Date
2014
Author(s)
Yang, Ching-Ted
Abstract
The construction of the high-tech plant has a lot of money to do all kinds of complex equipment interface , construction and schedule to catch a short period , special construction technology development, emphasis on risk management and other features, this study integrated circuit industry, high-tech plant body to do engineering construction experience for the spindle, summarized the key factors affecting the duration of the main trails and effectively shorten the duration of the practice , and the establishment of a viable , effective standard operating mode.
Previous works , as do the high-tech plant construction phase completed on schedule for the most basic requirements , except for the high-tech industry has accelerated the evolution of the characteristics of high-tech industries as technology continues to accelerate updated continuously shortening product life cycle , in order to gain competitive advantage and reduce production costs, through the construction of the plant will be developed in a short time a large number of products into production , in order to seize market opportunities and increase market share. Therefore, the construction of the high-tech plant construction schedule must have a sound control and rush mode to solve the various problems faced by the construction process must .
This study will focus on high-tech plant construction period control problem, gather engineering practice cases to be pooled analysis , presented by the case of the analysis of improper factors control the duration and conditions of rush , rush when manufacturers face a problem , how to apply the rush strategy way rush to the successful completion of the project , and analyze data for future similar projects in the reference case .
Keywords: high-tech plant , schedule control, crashing strategy
Subjects
高科技廠房
工期控管
趕工策略