Repository logo
  • English
  • 中文
Log In
Have you forgotten your password?
  1. Home
  2. College of Engineering / 工學院
  3. Civil Engineering / 土木工程學系
  4. 4D Automatic Scheduling in High-Tech Facility Construction
 
  • Details

4D Automatic Scheduling in High-Tech Facility Construction

Date Issued
2016
Date
2016
Author(s)
Hsu, Che-Wei
DOI
10.6342/NTU201603367
URI
http://ntur.lib.ntu.edu.tw//handle/246246/278167
Abstract
High-Tech industry develops rapidly in Taiwan. Due to the highly competitive market and the characteristic of short life-cycles in high-tech semiconductor products, high-tech facility construction must be promoted to adapt the trend. Quality management and schedule management become highly focused in a high-tech facility construction project. Building information modeling (BIM) is a tool that has well performance in integrating construction information. As a result, intensifying BIM applications in high-tech facility must have a great improvement in schedule management in construction site. Schedule and 3D CAD are two critical factors in 4D. However, schedule management and 3D CAD are still hard to integrate in current method. Planning construction schedule and drawing 3D CAD are two separated works. As a result, there is a linking process between 3D CAD and schedule. Integrating 3D model and schedule becomes the critical issue to improve the efficiency of 4D. The goal of this research is to develop a BIM-based automatic scheduling method and apply it on high-tech facility construction. The study first exported the information of high-tech facility objects from 3D model. The 4D automatic scheduling program calculated the duration and arranged the sequence of the objects according to the data in Resource Model and Action Model. Then, the program came up with a project schedule under the resource constraint. Project managers could check the result through the 4D faster than before and formulate the strategy. At last, the study used NTUEE 7-5 Nano Lab as a case study to demonstrate the methodology. This study presents a BIM-based automatic scheduling method that employs 3D objects to generate information required for project scheduling to deal with the complexity of high-tech facility construction and assist construction project managers in making appropriate decisions.
Subjects
Building information modeling
High-tech facility
Automatic Scheduling
Type
thesis
File(s)
Loading...
Thumbnail Image
Name

ntu-105-R03521709-1.pdf

Size

23.32 KB

Format

Adobe PDF

Checksum

(MD5):45668d05f8ea50f47c62b52afafd7b64

臺大位居世界頂尖大學之列,為永久珍藏及向國際展現本校豐碩的研究成果及學術能量,圖書館整合機構典藏(NTUR)與學術庫(AH)不同功能平台,成為臺大學術典藏NTU scholars。期能整合研究能量、促進交流合作、保存學術產出、推廣研究成果。

To permanently archive and promote researcher profiles and scholarly works, Library integrates the services of “NTU Repository” with “Academic Hub” to form NTU Scholars.

總館學科館員 (Main Library)
醫學圖書館學科館員 (Medical Library)
社會科學院辜振甫紀念圖書館學科館員 (Social Sciences Library)

開放取用是從使用者角度提升資訊取用性的社會運動,應用在學術研究上是透過將研究著作公開供使用者自由取閱,以促進學術傳播及因應期刊訂購費用逐年攀升。同時可加速研究發展、提升研究影響力,NTU Scholars即為本校的開放取用典藏(OA Archive)平台。(點選深入了解OA)

  • 請確認所上傳的全文是原創的內容,若該文件包含部分內容的版權非匯入者所有,或由第三方贊助與合作完成,請確認該版權所有者及第三方同意提供此授權。
    Please represent that the submission is your original work, and that you have the right to grant the rights to upload.
  • 若欲上傳已出版的全文電子檔,可使用Open policy finder網站查詢,以確認出版單位之版權政策。
    Please use Open policy finder to find a summary of permissions that are normally given as part of each publisher's copyright transfer agreement.
  • 網站簡介 (Quickstart Guide)
  • 使用手冊 (Instruction Manual)
  • 線上預約服務 (Booking Service)
  • 方案一:臺灣大學計算機中心帳號登入
    (With C&INC Email Account)
  • 方案二:ORCID帳號登入 (With ORCID)
  • 方案一:定期更新ORCID者,以ID匯入 (Search for identifier (ORCID))
  • 方案二:自行建檔 (Default mode Submission)
  • 方案三:學科館員協助匯入 (Email worklist to subject librarians)

Built with DSpace-CRIS software - Extension maintained and optimized by 4Science