行政院國家科學委員會專題研究計畫期中進度報告:即時洪水預報模式之研發與應用─子計畫:即時洪水預報展示系統之建立與應用(2/3)
Date Issued
2005
Date
2005
Author(s)
陳增壽
DOI
932625Z002004
Abstract
The main goal of the three-year
integrated research project, named “The
Development and Application of Model for
Real-time Flood Forecasting”, is
establishing a real-time flood forecasting
system for emergency response of flooding.
This project is 4th sub-project of the
integrated project, which is going to
establish the display system of real-time
flood forecasting for improving the present
flooding emergency response measures. The
display system will integrate all the monitor
information of watershed, the forecasting
results of all other sub-projects and the
hardy facility data of flood control. The
visual display system can provide quickly
and effectively information to
decision-makers.
According to the watershed location,
the occurred causes of flooding and the
regional demands, the Lan-Yang Creek
Basin is chosen as the pilot study area. To
maintain the display system conveniently in
the future, the construction of the system
will be divided into several modules,
including the system maintaining, the
real-time information monitoring, model
forecasting and decision supporting. The
results can be applied to the Lan-Yang
Creek Basin to reinforce the hydrology
monitoring and flood warning skills and
enhance the emergency response capabilities
for possible future floods.
Subjects
Lan-Yang Creek Basin
flood forecasting
real-time monitors
visual display system
emergency responses
Publisher
臺北市:國立臺灣大學生物環境系統工程學系暨研究所
Type
report
File(s)![Thumbnail Image]()
Loading...
Name
932625Z002004.pdf
Size
242.45 KB
Format
Adobe PDF
Checksum
(MD5):d2a9e584060f74e4bc36158cb9708e19
