Repository logo
  • English
  • 中文
Log In
Have you forgotten your password?
  1. Home
  2. College of Engineering / 工學院
  3. Civil Engineering / 土木工程學系
  4. Estimation of Sediment Yields from Landslide and its Post Failures Soil Loss in Shihmen Reservoir Watershed
 
  • Details

Estimation of Sediment Yields from Landslide and its Post Failures Soil Loss in Shihmen Reservoir Watershed

Date Issued
2012
Date
2012
Author(s)
Tsai, Zong-Xian
URI
http://ntur.lib.ntu.edu.tw//handle/246246/255517
Abstract
Landslides generate enormous volumes of sediment in mountainous watersheds; however, quantifying the downstream transport of landslide-derived sediment remains a challenge. This study estimated landslide volumes for the Shihmen Reservoir watershed in Taiwan, for six different time periods, using empirical landslide frequency-area and volume-area relationships. The percentage of total landslide volume reaching streams was estimated using empirical landslide runout models. Fluvial transport of landslide sediment to the reservoir was simulated using the Hydrological Simulation Program- FORTRAN (HSPF). Results indicate that landslide erosion rates ranged 0.4 mm yr-1 to 2.2 mm yr-1 during the periods of 1986-1998 and 1998-2003 , but rapidly increased to 7.9 mm yr-1 following Typhoon Aere in 2004. The percentage of landslide sediment delivered to streams decreased from 78% during the period of 1986-1998 to 55% in 2004. Although the delivery ratio was lower, this decrease is not necessarily associated with a decrease in the volume of landslide sediment reaching streams. Model simulations indicate that only a small proportion of the landslide material was delivered downstream. An average of 13% of the landslide material in the river was moved downstream during the period of 1986-1998. In 2004, the period including Typhoon Aere, the annual channel sedimentation accounted for approximately 23% of the landslide material moved to streams. Channel sediment yield in the study area was determined by transport capacity rather than sediment supply, due to a reduction in sediment transport capacity resulting from existing check dams. The imbalance between sediment supply and transport capacity has resulted in a considerable quantity of landslide material remaining in the upper-stream regions of the watershed. Landslides have both immediate and extended-duration effects on sediment discharge. Examining the role of post-failure soil loss/sediment yield of landslides is essential for basin management purposes. The comprehensive measurement of sediment yield and the production of existing landslides could provide a better understanding of post-failure behavior. This study investigated the post-failure sediment yield of 13 landslide sites in the Shihmen reservoir watershed during the rainy seasons of 2006 and 2007 using a total station. Our study showed that soil loss is dominated by rainfall conditions and that the geometric and geographic characteristics of each landslide can have significant influences on the efficiency of sediment delivery from fields. We observed that rainfall is important in determining landslide retrogression/enlargement, while the recovery of vegetation in the landslide area increases with time. Intuitive knowledge of these phenomena was confirmed by our data. We obtained valuable landslide measurement data, which could be useful for future landslide modeling. In addition, our results provide more general information about the behavior of landslides. Finally, we suggest two regression models for the estimation of gross soil loss from cumulative rainfall. We estimated gross soil loss of 0.78 to 1.06 m yr-1, which is equivalent to 20,670 to 28,090 t ha-1 yr-1. Using these estimates, we assessed the sources of sediment in the watershed. We found that the ratio of the landslide erosion, soil loss after landslide, and watershed soil erosion was approximately 66:31:3. The primary implication of this study is that remedying existing landslides might be more effective than any other solution in reducing the sources of sediment in the Shihmen reservoir watershed.
Subjects
landslides
landslide frequency-area statistical estimation
sediment delivery ratio
post-failure sediment yields
Shihmen reservoir watershed
Watershed sedimentation
SDGs

[SDGs]SDG15

Type
thesis
File(s)
Loading...
Thumbnail Image
Name

ntu-101-D94521015-1.pdf

Size

23.32 KB

Format

Adobe PDF

Checksum

(MD5):24eee12cd6122c86ef5edba4e97ca788

臺大位居世界頂尖大學之列,為永久珍藏及向國際展現本校豐碩的研究成果及學術能量,圖書館整合機構典藏(NTUR)與學術庫(AH)不同功能平台,成為臺大學術典藏NTU scholars。期能整合研究能量、促進交流合作、保存學術產出、推廣研究成果。

To permanently archive and promote researcher profiles and scholarly works, Library integrates the services of “NTU Repository” with “Academic Hub” to form NTU Scholars.

總館學科館員 (Main Library)
醫學圖書館學科館員 (Medical Library)
社會科學院辜振甫紀念圖書館學科館員 (Social Sciences Library)

開放取用是從使用者角度提升資訊取用性的社會運動,應用在學術研究上是透過將研究著作公開供使用者自由取閱,以促進學術傳播及因應期刊訂購費用逐年攀升。同時可加速研究發展、提升研究影響力,NTU Scholars即為本校的開放取用典藏(OA Archive)平台。(點選深入了解OA)

  • 請確認所上傳的全文是原創的內容,若該文件包含部分內容的版權非匯入者所有,或由第三方贊助與合作完成,請確認該版權所有者及第三方同意提供此授權。
    Please represent that the submission is your original work, and that you have the right to grant the rights to upload.
  • 若欲上傳已出版的全文電子檔,可使用Open policy finder網站查詢,以確認出版單位之版權政策。
    Please use Open policy finder to find a summary of permissions that are normally given as part of each publisher's copyright transfer agreement.
  • 網站簡介 (Quickstart Guide)
  • 使用手冊 (Instruction Manual)
  • 線上預約服務 (Booking Service)
  • 方案一:臺灣大學計算機中心帳號登入
    (With C&INC Email Account)
  • 方案二:ORCID帳號登入 (With ORCID)
  • 方案一:定期更新ORCID者,以ID匯入 (Search for identifier (ORCID))
  • 方案二:自行建檔 (Default mode Submission)
  • 方案三:學科館員協助匯入 (Email worklist to subject librarians)

Built with DSpace-CRIS software - Extension maintained and optimized by 4Science