Repository logo
  • English
  • 中文
Log In
Have you forgotten your password?
  1. Home
  2. College of Engineering / 工學院
  3. Civil Engineering / 土木工程學系
  4. A Study on Data Collection and Control Model for Project – the Public Construction Management Information System
 
  • Details

A Study on Data Collection and Control Model for Project – the Public Construction Management Information System

Date Issued
2012
Date
2012
Author(s)
Chou, Sou-Jung
URI
http://ntur.lib.ntu.edu.tw//handle/246246/255493
Abstract
The authorities of public construction should control with cautious the schedule performance and budge of public construction tenders. However, very few staff in charge from the authority emphasis on overall controlling of corrects information collection. In view of this, it is necessary to build a public construction management information system, which with simple and fast system function, to control the performance status, and provide anomaly monitoring mechanism. As far as the study method is concerned, this research, through the process of building system, studies a method of performance management and anomaly monitoring for public construction as reference to government administration. The study uses the technologies of relational database (RDB) to analyze the status of related information during the process of construction, selects the items that affect performance, then analyzes data by online analytical processing to provide hierarchical analytical of performance status, therefore establish data collecting model for construction management and confirm the relation among different items. In order to verify the evaluated items that affect the construction, the system adopts timing control to monitor the anomaly when the data of construction performing is filling, provides data filler the real-time information of data incomplete, and rules and regulations for seeking solution as a precautious. In addition, the system also employs management mechanism to integrate the models of handling anomaly, project performance evaluation, monitoring, and knowledge management, thereby to build a back-up system for supporting data management, observation, assessment and provide management analysis, further to enable governments of different levels to monitor the status of construction in a variable environment in order to enhance the performance of implementation. In recent years, the related issues of construction quality have attracted public attention gradually. By construction quality auditing and supervision, the construction authority can understand the quality and status of implementation for early detecting defect and correction as soon as possible to avoid missing the timing for improvement. Thus, quality audit is more crucial to construction quality; likewise, it is important to collect the related information completely after each quality audit, and know well of the progress and quality of high-risk indicators then to provide a framework to analyze data of progress and quality. The said analytic framework uses the data collected by system to analyze the record of performance status and quality audit to obtain quality risk model of different kinds of construction. Meanwhile, the correlation between these risk models and anomaly of construction will also available for establishing more integrated prediction models. The information provided by the system can be used as supplementary information to the project manager in government agencies, and then provides the authority with warning or appropriate management decision, in order to achieve the effectiveness of early prevention and early management. The results of this study are summarized as follows: 1. to establish a complete data collection method for administrative system in the phase of public construction. 2. to provide government agencies of all levels a construction management and control model. 3. to provide schedule management by using a variety of tables and anomaly analysis functions. 4. to collect factor information of significant impact on the progress to provide follow-up research and analysis. 5. to build a model for collecting data of the performance evaluation of quantitative analysis.
Subjects
Public Construction
Schedule Management
Public Construction Management Information System
Quality Audits
Type
thesis
File(s)
Loading...
Thumbnail Image
Name

ntu-101-P98521714-1.pdf

Size

23.32 KB

Format

Adobe PDF

Checksum

(MD5):f2d052b06049e99c4cda3e67c41fd555

臺大位居世界頂尖大學之列,為永久珍藏及向國際展現本校豐碩的研究成果及學術能量,圖書館整合機構典藏(NTUR)與學術庫(AH)不同功能平台,成為臺大學術典藏NTU scholars。期能整合研究能量、促進交流合作、保存學術產出、推廣研究成果。

To permanently archive and promote researcher profiles and scholarly works, Library integrates the services of “NTU Repository” with “Academic Hub” to form NTU Scholars.

總館學科館員 (Main Library)
醫學圖書館學科館員 (Medical Library)
社會科學院辜振甫紀念圖書館學科館員 (Social Sciences Library)

開放取用是從使用者角度提升資訊取用性的社會運動,應用在學術研究上是透過將研究著作公開供使用者自由取閱,以促進學術傳播及因應期刊訂購費用逐年攀升。同時可加速研究發展、提升研究影響力,NTU Scholars即為本校的開放取用典藏(OA Archive)平台。(點選深入了解OA)

  • 請確認所上傳的全文是原創的內容,若該文件包含部分內容的版權非匯入者所有,或由第三方贊助與合作完成,請確認該版權所有者及第三方同意提供此授權。
    Please represent that the submission is your original work, and that you have the right to grant the rights to upload.
  • 若欲上傳已出版的全文電子檔,可使用Open policy finder網站查詢,以確認出版單位之版權政策。
    Please use Open policy finder to find a summary of permissions that are normally given as part of each publisher's copyright transfer agreement.
  • 網站簡介 (Quickstart Guide)
  • 使用手冊 (Instruction Manual)
  • 線上預約服務 (Booking Service)
  • 方案一:臺灣大學計算機中心帳號登入
    (With C&INC Email Account)
  • 方案二:ORCID帳號登入 (With ORCID)
  • 方案一:定期更新ORCID者,以ID匯入 (Search for identifier (ORCID))
  • 方案二:自行建檔 (Default mode Submission)
  • 方案三:學科館員協助匯入 (Email worklist to subject librarians)

Built with DSpace-CRIS software - Extension maintained and optimized by 4Science