An Application of Integrated Activities with Multiple Start/Finish Method in Multiple Project Management

Date Issued
2006
Date
2006
Author(s)
Chiang, Chia-Chi
DOI
zh-TW
URI
http://ntur.lib.ntu.edu.tw//handle/246246/50373
Abstract
A Multiple Project is normally comprised of many projects under the control of Civil, Architectural, Electrical, Environmental, Mechanical and other divisions. These projects not only have inter-relationships among themselves but also have complex intra-relationships with many of their subprojects. Each of these projects and subprojects has its own resources and constraints. Each develops schedule plans by itself. When the multi-project gets into construction phase, environmental and engineering conditions may change and result in the change of inter-and-intra relationships among the projects and subprojects. These lead to the hardship to schedule the multi-project. Therefore, there is an urgent need to develop a multi-project scheduling method to deal with the dynamic scheduling problems. This paper introduces multiple start/finish integrated activity (IA) method that can be used in a multi-project scheduling for supplementing the conventional ADM/PDM scheduling method. With this new method and through its point- to-point in-task, IA tasks, interface monitoring, scheduling and controlling of a mega project can be achieved. The IA is the activity integrated with many other activities. The multiple start/finish means an activity has many start/finish points that make the internal activities to be interconnected among integrated activities. This method provides a continuous network for start-to-finish in multi-project scheduling networks. Generally, the ADM/PDM method uses only early or late date relationship with lag time to link related activities. This extended multiple start/finish function can skip over the lag time and cluster the activities into one designed group or project contract. This facilitates multi-project planning and scheduling. Meanwhile, it renovates the current practice of project scheduling and management. For instance, a large-scale construction project contract is usually broken downed into many smaller subcontracts. To assure the large-scale project on schedule, it is necessary to coordinate intensively during execution of the contracts. Thus, there is a need to have the interface of multiple start/finish for coordinating the progresses and schedules among groups. In this paper, multiple start/finish connection can be more efficiency to merge the group of activities for large-scale project control. It also simplifies the planning and scheduling of large-scale project. This paper presents a numerical example which illustrates the multiple start/finish theory and application. In addition, the advantages and practicability of the multiple start/finish activities method will be demonstrated through a computer program simulating the multi-project scheduling for a project.
Subjects
箭線式網圖╱先行式網圖
積體作業單元
排定工期
多重專案排程
ADM/PDM
Integrated activity (IA)
Desired Schedule
Multi-project scheduling
Type
thesis
File(s)
Loading...
Thumbnail Image
Name

ntu-95-P92521704-1.pdf

Size

23.31 KB

Format

Adobe PDF

Checksum

(MD5):d486dacd42e35b485d46f77816151b0d

臺大位居世界頂尖大學之列,為永久珍藏及向國際展現本校豐碩的研究成果及學術能量,圖書館整合機構典藏(NTUR)與學術庫(AH)不同功能平台,成為臺大學術典藏NTU scholars。期能整合研究能量、促進交流合作、保存學術產出、推廣研究成果。

To permanently archive and promote researcher profiles and scholarly works, Library integrates the services of “NTU Repository” with “Academic Hub” to form NTU Scholars.

總館學科館員 (Main Library)
醫學圖書館學科館員 (Medical Library)
社會科學院辜振甫紀念圖書館學科館員 (Social Sciences Library)

開放取用是從使用者角度提升資訊取用性的社會運動,應用在學術研究上是透過將研究著作公開供使用者自由取閱,以促進學術傳播及因應期刊訂購費用逐年攀升。同時可加速研究發展、提升研究影響力,NTU Scholars即為本校的開放取用典藏(OA Archive)平台。(點選深入了解OA)

  • 請確認所上傳的全文是原創的內容,若該文件包含部分內容的版權非匯入者所有,或由第三方贊助與合作完成,請確認該版權所有者及第三方同意提供此授權。
    Please represent that the submission is your original work, and that you have the right to grant the rights to upload.
  • 若欲上傳已出版的全文電子檔,可使用Open policy finder網站查詢,以確認出版單位之版權政策。
    Please use Open policy finder to find a summary of permissions that are normally given as part of each publisher's copyright transfer agreement.
  • 網站簡介 (Quickstart Guide)
  • 使用手冊 (Instruction Manual)
  • 線上預約服務 (Booking Service)
  • 方案一:臺灣大學計算機中心帳號登入
    (With C&INC Email Account)
  • 方案二:ORCID帳號登入 (With ORCID)
  • 方案一:定期更新ORCID者,以ID匯入 (Search for identifier (ORCID))
  • 方案二:自行建檔 (Default mode Submission)
  • 方案三:學科館員協助匯入 (Email worklist to subject librarians)

Built with DSpace-CRIS software - Extension maintained and optimized by 4Science