Repository logo
  • English
  • 中文
Log In
Have you forgotten your password?
  1. Home
  2. College of Science / 理學院
  3. Physics / 物理學系
  4. CEPC Technical Design Report: Accelerator
 
  • Details

CEPC Technical Design Report: Accelerator

Journal
Radiation Detection Technology and Methods
Journal Volume
8
Journal Issue
1
Start Page
1
End Page
1105
ISSN
2509-9930
2509-9949
Date Issued
2024-03
Author(s)
Abdallah, Waleed
Stathes Paganis  
et. al.
DOI
10.1007/s41605-024-00463-y
URI
https://scholars.lib.ntu.edu.tw/handle/123456789/731254
Abstract
The Circular Electron Positron Collider (CEPC) is a large scientific project initiated and hosted by China, fostered through extensive collaboration with international partners. The complex comprises four accelerators: a 30 GeV Linac, al.l GeV Damping Ring, a Booster capable of achieving energies up to 180 GeV, and a Collider operating at varying energy modes (Z, W, H, and tt). The Linac and Damping Ring are situated on the surface, while the subterranean Booster and Collider are housed ina100 km circumference underground tunnel, strategically accommodating future expansion with provisions for a potential Super Proton Proton Collider (SPPC). The CEPC primarily serves as a Higgs fketory. In its baseline design with synchrotron radiation (SR) power of30 MW per beam, it can achieve a luminosity of 5 x1034 cm-2s-1 per interaction point (IP), resulting in an integrated luminosity of 13 ab 1 for two IPs over a decade, producing 2.6millionHiggsbosons. IncreasingtheSRpowerto 50MWperbeam expands the CEPC's capability to generate 4.3 million Higgs bosons, facilitating precise measurements ofHiggs coupling at sub-percent levels, exceeding the precision expected from the HLLHCbyanorderofmagnitude. This Technical Design Report(TDR) follows the Preliminary Conceptual Design Report (Pre-CDR, 2015) and the Conceptual Design Report (CDR, 2018), comprehensively detailing the machine's layout, performance metrics, physical design and analysis, technical systems design, R&D and prototyping efforts, and associated civil engineering aspects. Additionally, it includes a cost estimate and a preliminary construction timeline, establishing a framework for forthcoming engineering design phase and site selection procedures. Construction is anticipated to begin around 2027-2028, pending government approval, with an estimated duration of 8 years. The commencement of experiments and data collection could potentially be initiated in the mid-2030s.
Publisher
Springer Science and Business Media LLC
Type
journal article

臺大位居世界頂尖大學之列,為永久珍藏及向國際展現本校豐碩的研究成果及學術能量,圖書館整合機構典藏(NTUR)與學術庫(AH)不同功能平台,成為臺大學術典藏NTU scholars。期能整合研究能量、促進交流合作、保存學術產出、推廣研究成果。

To permanently archive and promote researcher profiles and scholarly works, Library integrates the services of “NTU Repository” with “Academic Hub” to form NTU Scholars.

總館學科館員 (Main Library)
醫學圖書館學科館員 (Medical Library)
社會科學院辜振甫紀念圖書館學科館員 (Social Sciences Library)

開放取用是從使用者角度提升資訊取用性的社會運動,應用在學術研究上是透過將研究著作公開供使用者自由取閱,以促進學術傳播及因應期刊訂購費用逐年攀升。同時可加速研究發展、提升研究影響力,NTU Scholars即為本校的開放取用典藏(OA Archive)平台。(點選深入了解OA)

  • 請確認所上傳的全文是原創的內容,若該文件包含部分內容的版權非匯入者所有,或由第三方贊助與合作完成,請確認該版權所有者及第三方同意提供此授權。
    Please represent that the submission is your original work, and that you have the right to grant the rights to upload.
  • 若欲上傳已出版的全文電子檔,可使用Open policy finder網站查詢,以確認出版單位之版權政策。
    Please use Open policy finder to find a summary of permissions that are normally given as part of each publisher's copyright transfer agreement.
  • 網站簡介 (Quickstart Guide)
  • 使用手冊 (Instruction Manual)
  • 線上預約服務 (Booking Service)
  • 方案一:臺灣大學計算機中心帳號登入
    (With C&INC Email Account)
  • 方案二:ORCID帳號登入 (With ORCID)
  • 方案一:定期更新ORCID者,以ID匯入 (Search for identifier (ORCID))
  • 方案二:自行建檔 (Default mode Submission)
  • 方案三:學科館員協助匯入 (Email worklist to subject librarians)

Built with DSpace-CRIS software - Extension maintained and optimized by 4Science