https://scholars.lib.ntu.edu.tw/handle/123456789/425356
標題: | A flow shop sequencing problem with synchronous material transfers | 作者: | Mendoza, Abraham KWEI-LONG HUANG Ventura, Jos? A. KWEI-LONG HUANG |
關鍵字: | Flow shop scheduling | Heuristic algorithm | Makespan | Synchronous material movement | 公開日期: | 1-一月-2012 | 起(迄)頁: | 575 | 來源出版物: | 62nd IIE Annual Conference and Expo 2012 | 摘要: | We consider a machining center that consists of a loading/unloading station, a CNC machine station, and a rotary table, which is the material handling device that moves jobs between these two stations simultaneously. Given a set of jobs that need to be processed on the machining center, the objective of the problem is to find the job sequence that minimizes the makespan. In this paper, a 0-1 mixed-integer linear programming model for this problem is presented. In addition, a heuristic algorithm is proposed to obtain near-optimal solutions for large-scale versions of the problem. Computational results are also provided. |
URI: | https://scholars.lib.ntu.edu.tw/handle/123456789/425356 | DOI: | https://api.elsevier.com/content/abstract/scopus_id/84900306334 |
顯示於: | 工業工程學研究所 |
在 IR 系統中的文件,除了特別指名其著作權條款之外,均受到著作權保護,並且保留所有的權利。