https://scholars.lib.ntu.edu.tw/handle/123456789/425356
Title: | A flow shop sequencing problem with synchronous material transfers | Authors: | Mendoza, Abraham KWEI-LONG HUANG Ventura, Jos? A. KWEI-LONG HUANG |
Keywords: | Flow shop scheduling | Heuristic algorithm | Makespan | Synchronous material movement | Issue Date: | 1-Jan-2012 | Start page/Pages: | 575 | Source: | 62nd IIE Annual Conference and Expo 2012 | Abstract: | We consider a machining center that consists of a loading/unloading station, a CNC machine station, and a rotary table, which is the material handling device that moves jobs between these two stations simultaneously. Given a set of jobs that need to be processed on the machining center, the objective of the problem is to find the job sequence that minimizes the makespan. In this paper, a 0-1 mixed-integer linear programming model for this problem is presented. In addition, a heuristic algorithm is proposed to obtain near-optimal solutions for large-scale versions of the problem. Computational results are also provided. |
URI: | https://scholars.lib.ntu.edu.tw/handle/123456789/425356 | DOI: | https://api.elsevier.com/content/abstract/scopus_id/84900306334 |
Appears in Collections: | 工業工程學研究所 |
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.