https://scholars.lib.ntu.edu.tw/handle/123456789/40740
Title: | 行政院國家科學委員會專題研究計畫成果報告:防救災決策支援系統之研究─子計畫:土石流防救決策支援系統之研究 | Authors: | 朱子豪 | Keywords: | 土石流;決策支援系統;地理資訊系統;網路技術;Debris Flow;Decision Support System;Geographic Information System;Network Technology | Issue Date: | 1999 | Publisher: | 臺北市:國立臺灣大學地理環境資源學系暨研究所 | Abstract: | 土石流的發生及其災害的規模與程度 多具有空間分布的特性,土石流之潛勢分 析,危險度分析境況模擬皆涉及大量空間 及相關資料的整合、處理、分析、模擬與 展示,以形成對防救災決策有用的輔助資 訊,故必須仰賴先進的空間資訊技術與科 學工具來加以實現。本計畫擬結合地理資 訊系統與日益成熟的網路技術,在防災國 家型科技計畫整體架構下,與土石流災害 研究群與相關政府部門的研究相互配合, 整合其土石流災害潛勢分析成果與境況模 擬模式,共同規劃建立相關資料庫模式庫 及功能庫,以建置土石流防救決策支援系 統,有效並整合防災國家型科技計畫辦公 室、國科會相關計畫及政府相關單位土石 流防救研究工作之成果並協助其工作落實 於業的推動。 本計畫共分三年進行研究工作:第一 年進行土石流防救決策支援系統的整體規 劃整合前計畫已有之成果,並建立雛型系 統;第二年係依據土石流災害研究群的具 體需求擴充系統功能,並著手整合其適用 之資料庫與模式庫;第三年則進行最終系 統的建置與測試並可與其他災害防災決策 支援系統整合,並辦理技術移轉與教育訓 練。 第一年已完成了基本資料庫建立潛勢 模式收集與分析決策資源系統規劃與原型 建立。 most of the inducing factors are with spatial characteristics. With the help of advanced technology, mass spatial data can be integrated, processed, analyzed, simulated, displayed, and become useful information that can assist us in making decision on hazard mitigation and salvage. To actualize this plan, we highly depend on the hi-tech instruments. The project is planned to apply geographic information system and network technology -- under the scheme of the "National R&D Project for Natural Hazard Mitigation" and for the academic and governmental research groups of debris flow mitigation. And by integrating the hazard analysis and simulation models of debris flow development, an interrelated database for the decision support system of debris flow mitigation will be built to help all related units, of the government and this project, to carry out the salvage efficiently. This project is one of a three-year integrated project. In the first year, an overall integrated plan for the “Decision Support System of Hazard Mitigation & Salvage” and its prototype system will be set up. Then in the second year, the functionality and performance of the prototype system will be enhanced according to the need of the research groups and the government counterparts, as well as a database will be built up to fit the demands. Finally in the last year, the ultimate system shall be established, integrated and tested, and the technique transfer and the training will be carried out. In the first year the basic database essentral models, Dss system planing and prototype system have been collected or implimeaded. |
URI: | http://ntur.lib.ntu.edu.tw//handle/246246/11365 | Other Identifiers: | 882625Z002038 | Rights: | 國立臺灣大學地理環境資源學系暨研究所 |
Appears in Collections: | 地理環境資源學系 |
File | Description | Size | Format | |
---|---|---|---|---|
882625Z002038.pdf | 33.49 kB | Adobe PDF | View/Open |
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.