標題: | Schedule planning model for onshore wind turbine construction project subjected to the impact of wind [陸上風力發電機組興建工程受風不確定性因素影響之工期預測模式] | 作者: | Guo, S.-J. Chen, J.-H. Chiu, C.-H. SY-JYE GUO |
關鍵字: | Impact of wind; Schedule planning model; Wind turbine construction | 公開日期: | 2017 | 卷: | 29 | 期: | 2 | 起(迄)頁: | 109-117 | 來源出版物: | Journal of the Chinese Institute of Civil and Hydraulic Engineering | 摘要: | Because of its characteristics of low pollution and low cost, wind energy becomes one of the most promising renewable energy. With plentiful of wind energy, Taiwan is highly interested in establishing wind farms for sustainable green energy developments. However, wind could produce adverse impacts on some wind-sensitive tasks during constructing wind turbine projects. This research presents a schedule planning model for wind turbine construction project subjected to the impact of wind. Through the support of professional expertise, the employment of fuzzy membership functions, and the application of historical wind speed data, the productivity loss (PL) subjected to various Beaufort scale of wind can be analyzed and the duration can be simulated and forecasted by the model. Besides, an actual wind turbine construction project is used to demonstrate the practicality of the model. The findings from this research are very helpful in schedule planning for wind turbine construction projects subjected to the impact of wind. © 2017, Chinese Institute of Civil and Hydraulic Engineering. All right reserved. |
URI: | https://scholars.lib.ntu.edu.tw/handle/123456789/437831 | DOI: | 10.6652/JoCICHE.201706_29(2).0005 | SDG/關鍵字: | Energy policy; Membership functions; Wind; Wind power; Construction projects; Fuzzy membership function; Onshore wind turbine; Planning models; Productivity loss; Professional expertise; Renewable energies; Wind speed data; Wind turbines |
顯示於: | 土木工程學系 |
在 IR 系統中的文件,除了特別指名其著作權條款之外,均受到著作權保護,並且保留所有的權利。