Repository logo
  • English
  • 中文
Log In
Have you forgotten your password?
  1. Home
  2. College of Engineering / 工學院
  3. Civil Engineering / 土木工程學系
  4. Automatic extraction of daily concrete requirements from 3D BIM and project schedules
 
  • Details

Automatic extraction of daily concrete requirements from 3D BIM and project schedules

Journal
AIP Conference Proceedings
Journal Volume
2428
Date Issued
2021
Author(s)
Pham V.-H
Chen P.-H
Pal A
PO-HAN CHEN  
SHANG-HSIEN HSIEH  
DOI
10.1063/5.0071019
URI
https://www.scopus.com/inward/record.uri?eid=2-s2.0-85119055367&doi=10.1063%2f5.0071019&partnerID=40&md5=9af9582cc8df0a0efff4639f52c8cf7a
https://scholars.lib.ntu.edu.tw/handle/123456789/597949
Abstract
Concrete, the second most consumed material on earth after water, is considered as the backbone of modern construction. Excess or shortage in concrete supply may lead to wastage of material, time, and cost in a construction project. At present, ready-mixed concrete is widely used in the construction industry, and it is generally supplied to construction sites from offsite plants. The limitation of accurate estimation of daily concrete requirements leads to a difference in the ordered quantity and the actual requirement, and thus creates excess or shortage in supply. The advancement of 3D BIM made quantity takeoffs easier and more accurate for engineers. Considering the time and effort saved through the digitalization of construction projects, this study aims to integrate 3D BIM and project schedules for the automatic extraction of concrete supply schedules for construction projects. The use of different software for quantity takeoff and project scheduling purposes and their interoperability hinders such integration in practice. The tool developed in this study integrates quantity information extracted through BIM API and time in-formation from project schedules. The study is mainly focused on large and complex construction projects, where phase-wise construction is necessary, and quantity takeoffs are challenging when using built-in functions of BIM software. Extracted concrete supply schedules can be exported to spread-sheets for further analysis and, at the same time, be visualized through bar charts to assist with decision-making. Finally, a residential building project in Vietnam is used as a case study to prove the concept proposed in this study. ? 2021 American Institute of Physics Inc.. All rights reserved.
Subjects
BIM
Concrete supply
Digitalization
Project schedule
Wastage
Type
conference paper

臺大位居世界頂尖大學之列,為永久珍藏及向國際展現本校豐碩的研究成果及學術能量,圖書館整合機構典藏(NTUR)與學術庫(AH)不同功能平台,成為臺大學術典藏NTU scholars。期能整合研究能量、促進交流合作、保存學術產出、推廣研究成果。

To permanently archive and promote researcher profiles and scholarly works, Library integrates the services of “NTU Repository” with “Academic Hub” to form NTU Scholars.

總館學科館員 (Main Library)
醫學圖書館學科館員 (Medical Library)
社會科學院辜振甫紀念圖書館學科館員 (Social Sciences Library)

開放取用是從使用者角度提升資訊取用性的社會運動,應用在學術研究上是透過將研究著作公開供使用者自由取閱,以促進學術傳播及因應期刊訂購費用逐年攀升。同時可加速研究發展、提升研究影響力,NTU Scholars即為本校的開放取用典藏(OA Archive)平台。(點選深入了解OA)

  • 請確認所上傳的全文是原創的內容,若該文件包含部分內容的版權非匯入者所有,或由第三方贊助與合作完成,請確認該版權所有者及第三方同意提供此授權。
    Please represent that the submission is your original work, and that you have the right to grant the rights to upload.
  • 若欲上傳已出版的全文電子檔,可使用Open policy finder網站查詢,以確認出版單位之版權政策。
    Please use Open policy finder to find a summary of permissions that are normally given as part of each publisher's copyright transfer agreement.
  • 網站簡介 (Quickstart Guide)
  • 使用手冊 (Instruction Manual)
  • 線上預約服務 (Booking Service)
  • 方案一:臺灣大學計算機中心帳號登入
    (With C&INC Email Account)
  • 方案二:ORCID帳號登入 (With ORCID)
  • 方案一:定期更新ORCID者,以ID匯入 (Search for identifier (ORCID))
  • 方案二:自行建檔 (Default mode Submission)
  • 方案三:學科館員協助匯入 (Email worklist to subject librarians)

Built with DSpace-CRIS software - Extension maintained and optimized by 4Science