https://scholars.lib.ntu.edu.tw/handle/123456789/611630
標題: | Production modeling and simulation of surface mounting technology assembly industries using distributed agent oriented Petri net | 作者: | Kuo C.-H. Wing J.-J. Jeng M. CHUNG-HSIEN KUO |
關鍵字: | Distributed agent-oriented Petri net;Modeling and simulation;Production cycle time;Surface mountable component (SMC);Computer simulation;Distributed parameter control systems;Finite difference method;Mathematical models;Microprocessor chips;Petri nets;Printed circuit boards;Surface mount technology | 公開日期: | 2005 | 卷: | 2005 | 起(迄)頁: | 761-766 | 來源出版物: | 2005 IEEE Networking, Sensing and Control, ICNSC2005 - Proceedings | 摘要: | The surface mounting technology (SMT) is widely used in the printed circuit board (PCB) assembly industries. In general, the SMT assembly is categorized into the processes of chip feeding of surface mountable component (SMC), nuzzle exchange, chip pickup and chip placement. To increase the productivity and throughput, the SMT mounting machine is capable of pickup and placement of chips in the batch manner. In the case study, four nuzzles are allocated for assembly concurrently. Each nuzzle is desired for a group of SMC components with the geometry and weight considerations. In order to increase the assembly chip types of the SMT mounting machine, nuzzles are capable of automatic nuzzle change (ANC). The number of components in a batch is variable according to the nuzzle allocations of each nuzzle exchange. Finally, the components of each pickup batch are placed on the PCB board according to the chip position and direction. Therefore, the behaviors of the SMT assembly are characterized as the concurrent operations of the discrete event systems, and they can be modeled using the high level Petri nets. In this paper, the distributed agent-oriented Petri net (DAOPN) is used to model the production activities of the SMT assembly. The models of "initializing lane buffers", "allocating the ANC", "component pickup" and "component placement" are all modeled. The assembly cycle time can also calculated in terms of the simulation results. ? 2005 IEEE. |
URI: | https://www.scopus.com/inward/record.uri?eid=2-s2.0-33745173533&doi=10.1109%2fICNSC.2005.1461286&partnerID=40&md5=96f43255c4f200d57892cdb16ff50d3a https://scholars.lib.ntu.edu.tw/handle/123456789/611630 |
DOI: | 10.1109/ICNSC.2005.1461286 |
顯示於: | 機械工程學系 |
在 IR 系統中的文件,除了特別指名其著作權條款之外,均受到著作權保護,並且保留所有的權利。