公開日期 | 標題 | 作者 | 來源出版物 | scopus | WOS | 全文 |
2010 | Effective weighting model based on the maximum deviation with uncertain information | Lo, Tzu-Ping; Guo, Sy-Jye | Expert Systems with Applications | 25 | 23 | |
2017 | Empirical research on BIM application for cost estimation of HVAC system in buildings | Guo, S.-J.; Chiang, L.-W.; Chong, U.-O.; Chen, J.-Y.; SY-JYE GUO | 34th International Symposium on Automation and Robotics in Construction | | | |
2012 | Fire and thermal hazard analyses of industrial zeolite catalysis for phenol production | Tsai, H.-F.; Guo, S.-J.; Wu, S.-H.; SY-JYE GUO | Advanced Materials Research | | | |
2017 | Fuzzy duration forecast model for wind turbine construction project subject to the impact of wind uncertainty | Guo, S.-J.; Chen, J.-H.; Chiu, C.-H.; SY-JYE GUO | Automation in Construction | | | |
1996 | A generic cost-concern matrix for identifying automation needs in construction | Guo, S.-J.; Tucker, R.L.; SY-JYE GUO | Automation in Construction | | | |
2002 | Identification and Resolution of Space Conflicts in Building Construction | Guo, Sy-Jye | ASCE Journal of Construction Engineering and Management | | | |
2002 | Identification and resolution of work space conflicts in building construction | Guo, S.-J.; SY-JYE GUO | Journal of Construction Engineering and Management | | | |
2001 | Integrating CAD and Schedule for Identification and Resolution of Work Space Conflicts between Subcontractors | Guo, Sy-Jye | Canadian Journal of Civil Engineering 28 | 5 | 0 | |
2001 | Integrating CAD and schedule for identification and resolution of work space conflicts between subcontractors | SY-JYE GUO | Canadian Journal of Civil Engineering | 0 | 0 | |
2012 | Life Cycle Cost Analysis of Maintenance Costs and Budgets for University Buildings in Taiwan | Li, Chang-Sian; Guo, Sy-Jye | Journal of Asian Architecture and Building Engineering | 20 | 11 | |
2007 | Medical records for building health management | Chang, C.-Y.; Huang, S.-M.; Guo, S.-J.; SY-JYE GUO | Journal of Architectural Engineering | | | |
2009 | Owner Controlled Insurance Program and Construction Project Management for Taiwan High Speed Rail Project | Lu, I-Feng; Guo, Sy-Jye ; Pan, Yu-Jhe | Journal of Management in Engineering | 8 | 6 | |
2017 | Schedule planning model for onshore wind turbine construction project subjected to the impact of wind [陸上風力發電機組興建工程受風不確定性因素影響之工期預測模式] | Guo, S.-J.; Chen, J.-H.; Chiu, C.-H.; SY-JYE GUO | Journal of the Chinese Institute of Civil and Hydraulic Engineering | | | |
2007 | 大型醫院建築維護成本之預測模型 | 郭斯傑 | | | | |
2002 | 建築工程施工作業空間規劃與衝突分析流程之研究 | 郭斯傑 ; 黃契介; 吳俊達 | 中國土木水利工程學刊 | | | |
2000 | 建築工程營造綜合保險自負額之決策模式 | 郭斯傑 ; 邱必洙 | 中國土木水利工程學刊 | | | |
2004 | 強化建物施工勘驗制度刻不容緩 | 高秉鈞; 郭斯傑 ; 林明鏘 | 營建知訊 | | | |
1998 | 整合降雨天候影響之電腦輔助工期模擬預估系統開發 | 郭斯傑 | | | | |
2003 | 機電設備之變更設計對建築工程總完工期程之分析與影響(1/2) | 郭斯傑 | | | | |
2004 | 機電設備之變更設計對建築工程總完工期程之分析與影響(2/2) | 郭斯傑 | | | | |