公開日期 | 標題 | 作者 | 來源出版物 | scopus | WOS | 全文 |
2022 | Real-time individual workload management at tunnel worksite using wearable heart rate measurement devices | Chen W.-C; Tserng H.P.; HUI-PING TSERNG | Automation in Construction | | | |
2016 | Research of Equity Value Distribution and Calculation in Urban Renewal | Wang, S.-M.; Tserng, H.-P.; Huang, H.-T.; Lin, H.-C.; HUI-PING TSERNG | Journal of the Chinese Institute of Civil and Hydraulic Engineering | | | |
2021 | Research on Monitoring the Nature Frequency of Bridges by Using Wireless Sensors- Bao Bridge and Wanshou Bridge for Example [以無線感測儀器監測自然頻率之研究-寶橋及萬壽橋為例] | HUI-PING TSERNG ; Chen H.-Y; Lee P.-R; Chen C.-W. | Journal of the Chinese Institute of Civil and Hydraulic Engineering | 0 | 0 | |
2015 | Research on the earned value management system applied in consultancy project performance | Tserng, H.P.; Lin, W.-S.; Li, C.-C.; Weng, K.-W.; Loisel, D.C.; HUI-PING TSERNG | Journal of Marine Science and Technology (Taiwan) | | | |
2015 | Strategic governance for modeling institutional framework of public-private partnerships | Chou, J.-S.; Tserng, H.P.; Lin, C.; Huang, W.-H.; HUI-PING TSERNG | Cities | | | |
2018 | A Study of Integrating Support-Vector-Machine (SVM) Model and Market-based Model in Predicting Taiwan Construction Contractor Default | Huang, H.-T.; Tserng, H.-P.; HUI-PING TSERNG | KSCE Journal of Civil Engineering | | | |
2009 | A study of ontology-based risk management framework of construction projects through project life cycle | Tserng, H.P.; Yin, S.Y.L.; Dzeng, R.J.; Wou, B.; Tsai, M.D.; Chen, W.Y.; HUI-PING TSERNG | Automation in Construction | | | |
2010 | The use of knowledge map model in construction industry | Ping Tserng, H.; Yin, S.Y.-L.; HUI-PING TSERNG | Journal of Civil Engineering and Management | 25 | 20 | |
2022 | Using a Unique Retaining Method for Building Foundation Excavation: A Case Study on Sustainable Construction Methods and Circular Economy | Liu T.-Y; Ho S.-J; HUI-PING TSERNG ; Tzou H.-K. | Buildings | 5 | 4 | |
2014 | Web-based real time bridge scour monitoring system for disaster management [Internetin?s prieigos tilto i?plovimo steb?jimo realiuoju laiku sistema stichin?ms nelaim?ms valdyti] | Skibniewski, M.; Tserng, H.-P.; Ju, S.-H.; Feng, C.-W.; Lin, C.-T.; Han, J.-Y.; Weng, K.-W.; JEN-YU HAN ; CHIH-TING LIN ; HUI-PING TSERNG | Baltic Journal of Road and Bridge Engineering | 8 | 5 | |
2014 | Web-based real time bridge scour monitoring system for disaster management [Internetinės prieigos tilto išplovimo stebėjimo realiuoju laiku sistema stichinėms nelaimėms valdyti] | Skibniewski M; HUI-PING TSERNG ; Ju S.-H; Feng C.-W; CHIH-TING LIN ; JEN-YU HAN ; Weng K.-W; Hsu S.-C. | Baltic Journal of Road and Bridge Engineering | 8 | 5 | |
2003 | 不固定作業關係最佳化排程模式之研究(I) | 曾惠斌 | | | | |
2002 | 供應鏈理論應用於營建業電子商務之研究 | 曾惠斌 | | | | |
2000 | 利用衛星定位(GPS)建立工程施工作業路徑即時管控系統之研究 | 曾惠斌 | | | | |
2004 | 專案式供應鏈管理之模擬平台建構(I) | 曾惠斌 | | | | |
2007 | 應用資訊檢索技術於建構營建知識萃取模式之研究 | 曾惠斌 | | | | |
2017 | 房地產開發選擇權評價:二項式選擇權定價模型與蒙特卡羅模擬混合法 | 葉怡成(I-Cheng Yeh); 曾惠斌(Hui-Ping Tseng); 官苑鈞(Yuan-Chun Kuan); 謝博文(Po-Wen Hsieh); 曾惠斌 | 營建管理季刊 | | | |
1999 | 營建工程施工機具作業現場及時管控系統之研究 | 曾惠斌 | | | | |
2007 | 營建工程知識地圖自動擷取模式之發展及地圖建置之研究 | 曾惠斌 | | | | |
1999 | 營建工程資訊運籌管理之整合型研究─子計畫三:施工資訊運籌管理系統之研究(I) | 曾惠斌 | | | | |