第 1 到 77 筆結果,共 77 筆。
公開日期 | 標題 | 作者 | 來源出版物 | scopus | WOS | 全文 | |
---|---|---|---|---|---|---|---|
1 | 2022 | Two-part tariff contract design for a supplier base: A unifying methodology | Alcívar Espín R.A; YON-CHUN CHOU ; Huang C.-C. | IMA Journal of Management Mathematics | 1 | 0 | |
2 | 2019 | Dynamic matching of uncertain demand with uncertain supply for bike sharing systems | Chou, Y.-C.; Kamano, K.; Yu, M.-S.; YON-CHUN CHOU | International Journal of Industrial Engineering : Theory Applications and Practice | |||
3 | 2018 | A transshipment policy for dynamic pickup and delivery services with dual objectives | Kamano, K.; Chou, Y.-C.; YON-CHUN CHOU | European Journal of Industrial Engineering | |||
4 | 2017 | An analytic method of service parts classification for inventory management | Chang Chien, K.-C.; Chou, Y.-C.; YON-CHUN CHOU | International Conference on Computers and Industrial Engineering | |||
5 | 2017 | Expansion of finite lifetime capacity under random demand shocks | Chou, Y.-C.; Yang, T.-C.; Chen, T.-S.; YON-CHUN CHOU | International Journal of Advanced Manufacturing Technology | |||
6 | 2016 | A demand forecast method for the final ordering problem of service parts | YON-CHUN CHOU ; Hsu Y.S; Lu S.-Y. | International Journal of Industrial Engineering : Theory Applications and Practice | 3 | ||
7 | 2016 | A method for aligning serial batching decisions in a two-level organization of factory and distributed workstations | Chou, Y.-C.; Lin, Y.-L.; Chun, K.-F.; YON-CHUN CHOU | Journal of Intelligent Manufacturing | |||
8 | 2015 | Installed base forecast for final ordering of automobile service parts | Chou, Y.-C.; Hsu, Y.S.; Lin, H.-C.; YON-CHUN CHOU | International Journal of Information and Management Sciences | |||
9 | 2014 | A construction of knowledge rules for reactive planning of job-mix assignment to homogeneous serial batch machines | Chou, Y.-C.; Lin, Y.-L.; Chun, K.-F.; YON-CHUN CHOU | International Journal of Production Economics | |||
10 | 2014 | A comparative study on the performance of timing and sizing models of capacity expansion under volatile demand growth and finite equipment lifetime | Chou, Y.-C.; Sung, W.-C.; Lin, G.; Jahn, J.; YON-CHUN CHOU | Computers and Industrial Engineering | |||
11 | 2014 | Pickup and delivery routing with hub transshipment across flexible time periods for improving dual objectives on workload and waiting time | Chou, Y.-C.; Chen, Y.-H.; Chen, H.-M.; YON-CHUN CHOU | Transportation Research Part E: Logistics and Transportation Review | |||
12 | 2013 | Integrating machine scheduling and self-healing maintenance by job-mix pull control | Chou, Y.-C.; Huang, P.-H.; YON-CHUN CHOU | International Journal of Production Research | |||
13 | 2012 | Recency-based storage assignment and warehouse configuration for recurrent demands | Chou, Yon-Chun ; Chen, Yao-Hung; Chen, Hui-Min | Computers & Industrial Engineering | 14 | 11 | |
14 | 2011 | A capacity evaluation and trading model for semiconductor foundry manufacturing | Chiang, A.-H.; YON-CHUN CHOU ; WUN-HWA CHEN | International Journal of Advanced Manufacturing Technology | 9 | 8 | |
15 | 2010 | A framework of economic analysis for tapered technology-manufacturing alliances | Chou, Yon-Chun ; Huang, Hsing-Yi; Jahn, John; Kuo, Chien-Hung | International Journal of Production Economics | 11 | 9 | |
16 | 2010 | Erratum: A dynamic system model for proactive control of dynamic events in full-load states of manufacturing chains (International Journal of Production Research (2009) 47:9 (2485-2506)) | Huang, H.-Y.; Chou, Y.-C.; Chang, S.; YON-CHUN CHOU | International Journal of Production Research | |||
17 | 2009 | Service-based capacity strategy for manufacturing service duopoly of differentiated prices and lognormal random demand | Chung, H.-J.; YON-CHUN CHOU | International Journal of Production Economics | |||
18 | 2009 | Superior/Inferior Segment-Discriminated Ant System for combinatorial optimization problems | FENG-CHENG YANG ; YON-CHUN CHOU | Computers & Industrial Engineering | 3 | 3 | |
19 | 2009 | Using manufacturing capacity as a competition strategy: some sufficient conditions | Chou, Yon-chun ; Lu, Chun-Ju | International Journal of | |||
20 | 2009 | 專業製造之產能服務能耐的競爭理論,管理與系統 | 周雍強 ; 鍾顯榮 | TSSCI | |||
21 | 2007 | 生產網絡:不確定性、風險與協同控制-子計畫二:半導體供應鏈的協同產能與生產控制 (新制多年期第2年) | 周雍強 | ||||
22 | 2007 | 深次微米IC設計,製造,與測試之半導體工程鏈研究-子計畫四:工程暨製造複合系統之流程同步化方法 (新制多年期第1年) | 周雍強 | ||||
23 | 2007 | 總計畫-生產網絡:不確定性、風險與協同控制 (新制多年期第2年) | 周雍強 | ||||
24 | 2007 | 深次微米IC設計,製造,與測試之半導體工程鏈研究-子計畫四:工程暨製造複合系統之流程同步化方法 (新制多年期第2年) | 周雍強 | ||||
25 | 2007 | 總計畫-生產網絡:不確定性、風險與協同控制 (新制多年期第1年) | 周雍強 | ||||
26 | 2007 | 生產網絡:不確定性、風險與協同控制-子計畫二:半導體供應鏈的協同產能與生產控制 (新制多年期第1年) | 周雍強 | ||||
27 | 2007 | A dynamic system model for proactive control of dynamic events in full-load states of manufacturing chains | Huang, H.-Y.; Chou, Y.-C.; YON-CHUN CHOU | International Journal of | 22 | 17 | |
28 | 2007 | Using capacity as a competition strategy in a manufacturing duopoly | Chou, Y.-C.; YON-CHUN CHOU | IEEE International Symposium on Semiconductor Manufacturing Conference Proceedings | |||
29 | 2007 | Evaluating alternative capacity strategies in semiconductor manufacturing under uncertain demand and price scenarios | Chou, Yon-Chun; Cheng, C.-T.; FENG-CHENG YANG ; Liang, Yi-Yu; YON-CHUN CHOU ; Cheng, C.-T.; Yang, F.-C.; Liang, Y.-Y. | International Journal of Production Economics | |||
30 | 2007 | 不確定需求與高產能成本之寡佔產業的產能策略賽局模式 | 陳馨宇; 陳永豐; 周雍強 | 科技管理學刊 | |||
31 | 2006 | Managing dynamic events in full-load states of semiconductor manufacturing chains | Huang, H.-Y.; Chang, S.; Chen, J.-W.; Chou, Y.-C.; YON-CHUN CHOU | IEEE International Symposium on Semiconductor Manufacturing Conference Proceedings | |||
32 | 2005 | 產品多樣性對平行機台工作分派之影響模式 | 周雍強 ; 葉家佑; 張可興 | 台大工程學刊 | |||
33 | 2005 | Configuration, monitoring and control of semiconductor supply chains | Chang, Shi-Chung; Chen, Argon ; Chou, Yon | ||||
34 | 2005 | 先進分散式製造規劃與控制之研究(3/3) | 周雍強 | ||||
35 | 2005 | 隨機規劃法在半導體機台組態規劃之應用 | 林毓舜; 張毓恆; 周雍強 | 管理與系統 | |||
36 | 2005 | 12吋晶圓製造服務佳化工具與標竿環境之研發─子計畫二:半導體製造之協同式規劃與排程的促成技術研究(2/3) | 周雍強 | ||||
37 | 2004 | 先進分散式製造規劃與控制之研究(2/3) | 周雍強 | ||||
38 | 2004 | 半導體製造之先進製程?能就緒時點的經濟模式 | 周雍強 ; 黃俐瑀 | 科技管理學刊 | |||
39 | 2004 | 12吋晶圓製造服務佳化工具與標竿環境之研發─子計畫二:半導體製造之協同式規劃與排程的促成技術研究(1/3) | 周雍強 | ||||
40 | 2003 | Rationality and Risk Analysis in Capacity Planning | Chou, Yon-Chun ; Chen, Argon | ||||
41 | 2003 | 半導體製造之設備組態與產品組合規劃(3/3) | 周雍強 | ||||
42 | 2003 | 先進分散式製造規劃與控制之研究(1/3) | 周雍強 | ||||
43 | 2002 | The Fourth Asia-Pacific Conference On Industrial Engineering And Management System | Chou, Yon-Chun ; Chen, Argon; Yang, Feng-Cheng | ||||
44 | 2002 | Integration of Demand Planning and Manufacturing Planning | Chou, Yon-Chun ; Chen, Argon | ||||
45 | 2002 | Integration of demand planning and manufacturing planning | Chou, Yon-Chun ; Chen, Argon | ||||
46 | 2002 | Integration of Demand Planning and Manufacturing Planning | Chou, Yon-Chun ; Chen, Argon | ||||
47 | 2002 | 半導體供應網路決策品質促成技術研究─子計畫二:半導體製造廠網路之生產決策整合與投射(II) | 周雍強 | ||||
48 | 2002 | Economic analysis and optimization of tool portfolio in semiconductor manufacturing | Chou, Y.-C.; Wu, C.-S.; YON-CHUN CHOU | IEEE Transactions on Semiconductor Manufacturing | |||
49 | 2002 | 半導體製造之設備組態與產品組合規劃(2/3) | 周雍強 | ||||
50 | 2002 | Economic Analysis and Optimization of Tool Portfolio in Semiconductor Manufacturing | Chou, Yon-Chun ; Wu, Chuan-Shun | IEEE Transactions on Semiconductor Manufacturing | |||
51 | 2002 | 半導體供應網路決策品質促成技術研究─總計畫(II) | 周雍強 | ||||
52 | 2001 | 半導體製造之設備組態與產品組合規劃(1/3) | 周雍強 | ||||
53 | 2001 | 半導體供應網路決策品質促成技術研究(I)─總計畫 | 周雍強 | ||||
54 | 2001 | A resource portfolio planning methodology for semiconductor wafer manufacturing | Chou, Y.-C.; You, R.-C.; YON-CHUN CHOU | International Journal of Advanced Manufacturing Technology | |||
55 | 2001 | 半導體供應網路決策品質促成技術研究(I)─子計畫二:半導體製造廠網路之生產決策整合與投射 | 周雍強 | ||||
56 | 2001 | Integration of capacity planning techniques for tool portfolio planning in semiconductor manufacturing | YON-CHUN CHOU ; Wu C.-S; Kao C.-E; Hsieh S.-H. | International Journal of Industrial Engineering : Theory Applications and Practice | 5 | ||
57 | 2000 | A tool portfolio planning methodology for semiconductor wafer fabs | Kao, Chung-En; YON-CHUN CHOU | Semiconductor Manufacturing Technology Workshop | 5 | 0 | |
58 | 2000 | 晶圓廠總體設備效能提昇與管理研究(2/2)─晶圓廠總體設備效能提昇與管理研究(2/2)─總計畫 | 周雍強 | ||||
59 | 2000 | Product mix planning in semiconductor foundry manufacturing | Chou, Y.-C.; YON-CHUN CHOU | 2000 Semiconductor Manufacturing Technology Workshop | |||
60 | 2000 | 晶圓廠設備整體效能提昇與管理系統(2/2)─子計畫一:晶圓廠組態設計與設備運用 | 周雍強 | ||||
61 | 2000 | A methodology for product mix planning in semiconductor foundry manufacturing | Chou, Yon-Chun ; Hong, I-Hsuan | IEEE Transactions on Semiconductor Manufacturing | 43 | 35 | |
62 | 1999 | 晶圓廠設備整體效能提昇與管理系統─子計畫二:晶圓廠組態設計與設備運用(1/3) | 周雍強 | ||||
63 | 1999 | 非等效並聯機台的生產規劃與排程 | 周雍強 | ||||
64 | 1999 | A tool portfolio planning methodology for semiconductor wafer fabs | You, R.-C.; Weng, C.-R.; Chou, Y.-C.; Wu, H.H.; Lu, L.-C.; YON-CHUN CHOU | 1999 IEEE International Symposium on Semiconductor Manufacturing | |||
65 | 1999 | Product mix planning in semiconductor manufacturing | Hong I.H.; Chou Y.-C.; Kuo C.-Y.; I-HSUAN HONG ; YON-CHUN CHOU | 1999 IEEE International Symposium on Semiconductor Manufacturing | 4 | 0 | |
66 | 1999 | 晶圓廠總體設備效能提昇與管理系統─晶圓廠總體設備效能提昇與管理系統─總計畫(1/3) | 周雍強 | ||||
67 | 1999 | Configuration design of complex integrated manufacturing systems | Chou, Y.-C.; YON-CHUN CHOU | International Journal of Advanced Manufacturing Technology | |||
68 | 1998 | 石化暨燃油的生產運籌與製程控制之整合 | 周雍強 | ||||
69 | 1998 | 大量多樣生產型態的排程方法 | 周雍強 | ||||
70 | 1998 | 生產變異與週期時間減廢 | 周雍強 | ||||
71 | 1997 | 積體電路生產敏捷性的提昇 | 周雍強 | ||||
72 | 1994 | Geometric reasoning for layout design of machining fixtures | Chou, Y.-C.; YON-CHUN CHOU | International Journal of Computer Integrated Manufacturing | |||
73 | 1994 | Automatic design of machining fixtures: Conceptual design | Chou, Y.-C.; Srinivas, R.A.; Saraf, S.; YON-CHUN CHOU | The International Journal of Advanced Manufacturing Technology | |||
74 | 1993 | Automated Fixture Design for Concurrent Manufacturing Planning | Chou, Y.-C.; YON-CHUN CHOU | Concurrent Engineering | |||
75 | 1992 | A theoretical framework for automatic layout of machining fixtures | Chou, Y.-C.; YON-CHUN CHOU | Artificial Intelligence for Engineering, Design, Analysis and Manufacturing | |||
76 | 1989 | A mathematical approach to automatic configuration of machining fixtures: Analysis and synthesis | Chou, Y.-C.; Chandru, V.; YON-CHUN CHOU | Journal of Manufacturing Science and Engineering, Transactions of the ASME | 237 | 0 | |
77 | 1987 | MATHEMATICAL APPROACH TO AUTOMATIC DESIGN OF FIXTURES: ANALYSIS AND SYNTHESIS. | YON-CHUN CHOU ; Chandru Vijaya; Barash Moshe M. | American Society of Mechanical Engineers, Production Engineering Division (Publication) PED | 12 |