Results 1-95 of 95 (Search time: 0.014 seconds).
Issue Date | Title | Author(s) | Source | scopus | WOS | Fulltext/Archive link | |
---|---|---|---|---|---|---|---|
1 | 2023 | A Contingency Model of Strategic Responses to the Institutional Challenges in Emerging Countries: Evidence and Findings from Least Developed Countries | Ping Ho, S.; Dahal, Rameshwar; HUI-PING TSERNG | Journal of Management in Engineering | 2 | 2 | |
2 | 2022 | Using a Unique Retaining Method for Building Foundation Excavation: A Case Study on Sustainable Construction Methods and Circular Economy | Liu T.-Y; Ho S.-J; HUI-PING TSERNG ; Tzou H.-K. | Buildings | 5 | 4 | |
3 | 2022 | Real-time individual workload management at tunnel worksite using wearable heart rate measurement devices | Chen W.-C; Tserng H.P.; HUI-PING TSERNG | Automation in Construction | |||
4 | 2021 | Developing a risk management process for infrastructure projects using idef0 | Tserng H.-P; Cho I.-C; Chen C.-H; Liu Y.-F.; HUI-PING TSERNG | Sustainability (Switzerland) | |||
5 | 2021 | Research on Monitoring the Nature Frequency of Bridges by Using Wireless Sensors- Bao Bridge and Wanshou Bridge for Example [以無線感測儀器監測自然頻率之研究-寶橋及萬壽橋為例] | HUI-PING TSERNG ; Chen H.-Y; Lee P.-R; Chen C.-W. | Journal of the Chinese Institute of Civil and Hydraulic Engineering | 0 | 0 | |
6 | 2020 | A novel IoT application system using wearable PPG heart rate monitoring devices to improve safety management for shield tunnel construction projects | Chen, W.-C.; Tserng, H.-P.; Huang, J.; HUI-PING TSERNG | 37th International NO-DIG Conference and Exhibition 2019 | |||
7 | 2019 | 臺灣私有建築物耐震評估補強經費之財務供需規劃暨其配套措施研議 | 周瑞生(Jui-Sheng Chou); 歐昱辰(Yu-Chen Ou); 曾惠斌(Hui-Ping Tserng); 陳瑞鈴(Jui-Ling Chen); 蔡綽芳(Chou-Fang Tsai); 張人傑(Jen-Chieh Chang); 曾惠斌 | 營建管理季刊 | |||
8 | 2019 | Earthquake damage assessment and cost-benefit analysis of seismic retrofitting for private buildings in metropolitan area: case studies on Xingfu and Weiguanjinlong buildings in Tainan city | 都會區私有建築物震損評估與耐震補強成本效益分析-以臺南市幸福及維冠金龍大樓為例 | Chou, J.-S.; Ou, Y.-C.; Tserng, H.-P.; Chen, J.-L.; Tsai, C.-F.; Wu, Y.-Z.; Chen, Y.-M.; Yu-Chen Ou ; HUI-PING TSERNG | Journal of the Chinese Institute of Civil and Hydraulic Engineering | |||
9 | 2019 | Management and Research on Public Construction Contract Termination and Cancellation - A Case Study of School Building Renovation Project | 卓逸程(I-Cheng Cho); 曾惠斌(H. P Tserng); 徐景文(Ching-Wen Hsu); 曾惠斌 | 建築學報 | |||
10 | 2018 | A Study of Integrating Support-Vector-Machine (SVM) Model and Market-based Model in Predicting Taiwan Construction Contractor Default | Huang, H.-T.; Tserng, H.-P.; HUI-PING TSERNG | KSCE Journal of Civil Engineering | |||
11 | 2017 | 房地產開發選擇權評價:二項式選擇權定價模型與蒙特卡羅模擬混合法 | 葉怡成(I-Cheng Yeh); 曾惠斌(Hui-Ping Tseng); 官苑鈞(Yuan-Chun Kuan); 謝博文(Po-Wen Hsieh); 曾惠斌 | 營建管理季刊 | |||
12 | 2017 | An integrated methodology for construction BIM & ERP by using UML tool | Chen, Y.-R.; Tserng, H.P.; HUI-PING TSERNG | ISARC 2017 - Proceedings of the 34th International Symposium on Automation and Robotics in Construction | |||
13 | 2017 | Automating the generation of indoor space topology for 3D route planning using BIM and 3D-GIS techniques | Lin W.Y; Lin P.H; Tserng H.P.; HUI-PING TSERNG | ISARC 2017 - Proceedings of the 34th International Symposium on Automation and Robotics in Construction | |||
14 | 2016 | The measurement factor of employee participation for Knowledge Management System in engineering consulting firms | Tserng, H.P.; Lee, M.-H.; Hsieh, S.-H.; HUI-PING TSERNG ; Hsieh S.-H. | Journal of Civil Engineering and Management | 9 | 6 | |
15 | 2016 | Research of Equity Value Distribution and Calculation in Urban Renewal | Wang, S.-M.; Tserng, H.-P.; Huang, H.-T.; Lin, H.-C.; HUI-PING TSERNG | Journal of the Chinese Institute of Civil and Hydraulic Engineering | |||
16 | 2015 | Public private partnership in major Taiwan infrastructure projects | Chou J.-S; HUI-PING TSERNG ; Tseng K.-C; Lin C. | Public Private Partnerships: A Global Review | 0 | 0 | |
17 | 2015 | Strategic governance for modeling institutional framework of public-private partnerships | Chou, J.-S.; Tserng, H.P.; Lin, C.; Huang, W.-H.; HUI-PING TSERNG | Cities | |||
18 | 2015 | A grey system theory-based default prediction model for construction firms | Tserng, H.P.; Ngo, T.L.; Chen, P.C.; Quyen Tran, L.; HUI-PING TSERNG | Computer-Aided Civil and Infrastructure Engineering | |||
19 | 2015 | Research on the earned value management system applied in consultancy project performance | Tserng, H.P.; Lin, W.-S.; Li, C.-C.; Weng, K.-W.; Loisel, D.C.; HUI-PING TSERNG | Journal of Marine Science and Technology (Taiwan) | |||
20 | 2014 | Proactive measures of governmental debt guarantees to facilitate Public-Private Partnerships project | Tserng, H.P.; Ho, S.-P.; Chou, J.-S.; HUI-PING TSERNG ; SHIH-PING HO | Journal of Civil Engineering and Management | 21 | 16 | |
21 | 2014 | Web-based real time bridge scour monitoring system for disaster management [Internetinės prieigos tilto išplovimo stebėjimo realiuoju laiku sistema stichinėms nelaimėms valdyti] | Skibniewski M; HUI-PING TSERNG ; Ju S.-H; Feng C.-W; CHIH-TING LIN ; JEN-YU HAN ; Weng K.-W; Hsu S.-C. | Baltic Journal of Road and Bridge Engineering | 8 | 5 | |
22 | 2014 | Developing BIM-assisted as-built schedule management system for general contractors | Tserng, H.-P.; Ho, S.-P.; HUI-PING TSERNG ; SHIH-PING HO | Journal of Civil Engineering and Management | 32 | 24 | |
23 | 2014 | Web-based real time bridge scour monitoring system for disaster management [Internetin?s prieigos tilto i?plovimo steb?jimo realiuoju laiku sistema stichin?ms nelaim?ms valdyti] | Skibniewski, M.; Tserng, H.-P.; Ju, S.-H.; Feng, C.-W.; Lin, C.-T.; Han, J.-Y.; Weng, K.-W.; JEN-YU HAN ; CHIH-TING LIN ; HUI-PING TSERNG | Baltic Journal of Road and Bridge Engineering | 8 | 5 | |
24 | 2014 | Prediction of default probability for construction firms using the logit model | Tserng, H.P.; Chen, P.-C.; Huang, W.-H.; Lei, M.C.; Tran, Q.H.; HUI-PING TSERNG | Journal of Civil Engineering and Management | |||
25 | 2014 | A grey system theory in construction industry default prediction | Huang, W.-H.; Tserng, H.-P.; Chen, P.-C.; Nguyen, M.D.; HUI-PING TSERNG | Advanced Materials Research | |||
26 | 2014 | Dynamic threshold cash flow-based structural model for contractor financial prequalification | Huang, W.-H.; Tserng, H.P.; Jaselskis, E.J.; Lee, S.-Y.; HUI-PING TSERNG | Journal of Construction Engineering and Management | |||
27 | 2014 | An implementation of light-weight compression algorithm for wireless sensor network technology in structure health monitoring | Hsu, C.-H.; Lin, C.-T.; Tserng, H.-P.; CHIH-TING LIN ; HUI-PING TSERNG ; JEN-YU HAN | 2014 IEEE World Forum on Internet of Things | 12 | 0 | |
28 | 2014 | An improved approach to the subcontracting procurement process in a lean construction setting | Yin, S.Y.-L.; Tserng, H.P.; Toong, S.N.; Ngo, T.L.; HUI-PING TSERNG | Journal of Civil Engineering and Management | |||
29 | 2013 | GPS-Based real-time guidance information system for marine pier construction | HUI-PING TSERNG ; JEN-YU HAN ; CHIH-TING LIN ; Skibniewski, Mirosław; Weng, Kai-Wei | Journal of Surveying Engineering | 3 | 2 | |
30 | 2013 | Contractor financial prequalification using simulation method based on cash flow model | Wen-Haw Huang; HUI-PING TSERNG ; HSIEN-HSING LIAO ; Samuel Y.L. Yin; PO-CHENG HSU ; Man Cheng Lei | Automation in Construction | 17 | 12 | |
31 | 2013 | A lean prebid planning model for construction contractors: A case study in Vietnam | HUI-PING TSERNG ; Yin, S.Y.-L.; Ngo, T.L. | Journal of Marine Science and Technology (Taiwan) | |||
32 | 2013 | Enhancing knowledge sharing management using BIM technology in construction | Ho, S.-P.; Tserng, H.-P.; HUI-PING TSERNG ; SHIH-PING HO | The Scientific World Journal | 49 | 38 | |
33 | 2012 | Analyzing the Role of National PPP Unit in Promoting PPP—Using New Institutional Economics and Case Study | HUI-PING TSERNG ; Russell, Jeffrey S.; Hsu, Ching-Wen; Lin, Chieh | Journal of Construction Engineering and Management | 45 | 42 | |
34 | 2012 | A novel dynamic progress forecasting approach for construction projects | Chiao Lin, M.; Ping Tserng, H. ; SHIH-PING HO ; D.L. Young | Expert Systems with Applications | |||
35 | 2012 | High efficient synchronization-on-demand protocol of IEEE 802.15.4 wireless sensor network for construction monitoring | CHIH-TING LIN ; Huang, Ji-De; Wu, Wen-Jong ; Han, Jen-Yu ; Tserng, Hui-Ping ; CHIH-TING LIN | International Journal of Automation and Smart Technology | |||
36 | 2012 | Integration of accounting-based and option-based models to predict construction contractor default | Tsai, L.-K.; Tserng, H.-P.; Liao, H.-H.; Chen, P.-C.; Wang, W.-P.; HUI-PING TSERNG | Journal of Marine Science and Technology (Taiwan) | |||
37 | 2012 | Comparison analysis of emergency evacuation between computer simulations and real exercises for large-space buildings | Tserng, H.P.; You, J.-Y.; Chang, C.-Y.; Hsiung, K.-H.; HUI-PING TSERNG | Journal of the Chinese Institute of Engineers, Transactions of the Chinese Institute of Engineers, Series A | |||
38 | 2012 | Predicting construction contractor default with barrier option model | HUI-PING TSERNG ; HSIEN-HSING LIAO ; Jaselskis, E.J.; Tsai, L.K.; Chen, Po-Cheng | Journal of Construction Engineering and Management | 21 | 18 | |
39 | 2012 | Critical factors and risk allocation for PPP policy: Comparison between HSR and general infrastructure projects | Chou, J.-S.; Ping Tserng, H.; Lin, C.; Yeh, C.-P.; HUI-PING TSERNG | Transport Policy | |||
40 | 2011 | Quality assessment for LiDAR point cloud registration using in-situ conjugate features | CHIH-TING LIN ; Han, Jen-Yu ; Tserng, Hui-Ping | International Geoscience and Remote Sensing Symposium | 2 | 0 | |
41 | 2011 | Predicting construction contractor default with option-based credit models-models' performance and comparison with financial ratio models | HUI-PING TSERNG ; HSIEN-HSING LIAO ; Tsai, L.K.; Chen, Po-Cheng | Journal of Construction Engineering and Management | 18 | 15 | |
42 | 2011 | An enforced support vector machine model for construction contractor default prediction | Tserng, H.Ping ; Lin, Gwo-Fong ; Tsai, L.Ken; Chen, Po-Cheng | Automation in Construction | 54 | 48 | |
43 | 2011 | The hot area evacuation model application in large scale gymnasiums | Tserng, Hui Ping ; You, Jia Yi; Chang, Chih Yuan; Hsiung, Kuang Hua | Journal of Civil Engineering and Management | 4 | 4 | |
44 | 2011 | Modularization and assembly algorithm for efficient MEP construction | Tserng, H.Ping ; Yin, Y.L.; Jaselskis, Edward J.; Hung, Wu-Chueh; Lin, Yi-Chieh | Automation in Construction | 26 | 23 | |
45 | 2011 | Developing a Construction-Duration Model Based on a Historical Dataset for Building Project | Lin, Ming-Chiao; Tserng, Hui Ping ; Ho, Shih-Ping ; Young, Der-Liang | Journal of Civil Engineering and Management | 22 | 18 | |
46 | 2010 | Developing an ARIS-house-based method from existing information systems to project-based enterprise resource planning for general contractor | HUI-PING TSERNG ; Yin, Samuel Y.L.; Skibniewski, Miroslaw J.; Lee M.H. | Journal of Construction Engineering and Management | 6 | 6 | |
47 | 2010 | A production modeling with genetic algorithms for a stationary pre-cast supply chain | Li, Sherman H.A.; Tserng, H.Ping ; Yin, Samuel Y.L.; Hsu, Ching-Wen | Expert Systems with Applications | 29 | 27 | |
48 | 2010 | The use of knowledge map model in construction industry | Ping Tserng, H.; Yin, S.Y.-L.; HUI-PING TSERNG | Journal of Civil Engineering and Management | 25 | 20 | |
49 | 2009 | Maintenance strategy for bridge components on the basis of performance | Tserng, H.P.; Yin, S.Y.-L.; Chung, C.-L.; HUI-PING TSERNG | Journal of Performance of Constructed Facilities | |||
50 | 2009 | Analysing dispute mediation cases of infrastructure projects through project life cycle | Tserng, H.P.; Teng, W.-K.; HUI-PING TSERNG | Structure and Infrastructure Engineering | |||
51 | 2009 | Developing a precast production management system using RFID technology | Yin, S.Y.L.; Tserng, H.P.; Wang, J.C.; Tsai, S.C.; HUI-PING TSERNG | Automation in Construction | |||
52 | 2009 | A study of ontology-based risk management framework of construction projects through project life cycle | Tserng, H.P.; Yin, S.Y.L.; Dzeng, R.J.; Wou, B.; Tsai, M.D.; Chen, W.Y.; HUI-PING TSERNG | Automation in Construction | |||
53 | 2009 | Exploring the effectiveness of chinese-to-english machine translation for clir applications in earthquake engineering | Lin, K.Y.; Chou, K.W.; Lin, H.T.; SHANG-HSIEN HSIEH ; HUI-PING TSERNG | Journal of Computing in Civil Engineering | 5 | 5 | |
54 | 2008 | A model of integrating the cycle of construction knowledge flows: Lessons learned in Taiwan | Yin, S.Y.L.; Tserng, H.P.; Tsai, M.D.; HUI-PING TSERNG | Automation in Construction | |||
55 | 2008 | Developing a project knowledge management framework for tunnel construction: Lessons learned in Taiwan | Tserng, H.P.; Chang, C.-H.; HUI-PING TSERNG | Canadian Journal of Civil Engineering | |||
56 | 2008 | Distilling and managing engineers' experience in construction projects using a pattern approach | Chang, C.-H.; Lin, Y.-C.; Tserng, H.P.; HUI-PING TSERNG | Construction Management and Economics | |||
57 | 2008 | Closure to "developing a Resource Supply Chain Planning System for Construction Projects" by H. Ping Tserng, Samuel Y. L. Yin, and Sherman H. A. Li | HUI-PING TSERNG ; Yin, S.Y.L.; Li, Sherman H. A. | Journal of Construction Engineering and Management | 1 | 1 | |
58 | 2008 | Enabling the creation of domain-specific reference collections to support text-based information retrieval experiments in the architecture, engineering and construction industries | Lin, K.Y.; Hsieh, S.H. ; Tserng, H.P.; Chou, K.W.; Lin, H.T.; Huang, C.P.; HUI-PING TSERNG | Advanced Engineering Informatics | 13 | 11 | |
59 | 2007 | 營建工程知識地圖自動擷取模式之發展及地圖建置之研究 | 曾惠斌 | ||||
60 | 2007 | 應用資訊檢索技術於建構營建知識萃取模式之研究 | 曾惠斌 | ||||
61 | 2007 | Health Assessment and Maintenance Strategy for Bridge Management Systems: Lessons Learned in Taiwan | Tserng, H. Ping; Chung, Chin-Lung; HUI-PING TSERNG | Journal of Infrastructure Systems | |||
62 | 2007 | Establishing domain testing resources to support advance text-based information retrieval applications for architecture, engineering, construction and facility management (AEC/FM) | Lin, K.Y.; SHANG-HSIEN HSIEH ; HUI-PING TSERNG ; Chou, K.W.; Lin, H.T.; Huang, C.P.; Tzeng K.F. | Congress on Computing in Civil Engineering, Proceedings | 1 | 0 | |
63 | 2006 | Object-oriented scheduling for repetitive projects with soft logics | Fan, S.-L.; Tserng, H.P.; HUI-PING TSERNG | Journal of Construction Engineering and Management | |||
64 | 2006 | Developing a resource supply chain planning system for construction projects | Tserng, H.P.; Yin, S.Y.L.; Li, S.; HUI-PING TSERNG | Journal of Construction Engineering and Management | |||
65 | 2006 | Automated construction of the Paghuashan tunnel for Taiwan High Speed Rail (THSR) project | Lin, P.H.; Tserng, H.P.; Lin, C.C.; HUI-PING TSERNG | Automation in Construction | |||
66 | 2006 | Enhancing knowledge exchange through web map-based knowledge management system in construction: Lessons learned in Taiwan | Lin, Y.-C.; Wang, L.-C.; Tserng, H.P.; HUI-PING TSERNG | Automation in Construction | |||
67 | 2005 | Mobile construction supply chain management using PDA and Bar Codes | Tserng, H.P.; Dzeng, R.-J.; Lin, Y.-C.; HUI-PING TSERNG ; SHIANG-TAI LIN | Computer-Aided Civil and Infrastructure Engineering | 52 | 39 | |
68 | 2005 | Automating schedule review for expressway construction | Dzeng, R.J.; Tserng, H.P.; Wang, W.C.; HUI-PING TSERNG | Journal of Construction Engineering and Management | |||
69 | 2005 | 營造業建置企業資源規劃(ERP)導入模式之建構與研究 | 曾惠斌 | ||||
70 | 2004 | 專案式供應鏈管理之模擬平台建構(I) | 曾惠斌 | ||||
71 | 2004 | Developing an activity-based knowledge management system for contractors | Tserng, H.-Ping ; Lin, Yu-Cheng | Automation in Construction 13 | 81 | 56 | |
72 | 2004 | Module-based construction schedule administration for public infrastructure agencies | Dzeng, R.J.; Wang, W.C.; Tserng, H.P.; HUI-PING TSERNG | Journal of Construction Engineering and Management | |||
73 | 2003 | Development of an object-oriented scheduling model for construction projects | Fan, Su-Ling; Tserng, H.P.; HUI-PING TSERNG | Automation in Construction 12, 283–302 | 19 | 19 | |
74 | 2003 | 不固定作業關係最佳化排程模式之研究(I) | 曾惠斌 | ||||
75 | 2003 | Developing an electronic acquisition model for project scheduling using XML-based information standard | Tserng, H.P.; Lin, W.Y.; HUI-PING TSERNG | Automation in Construction | |||
76 | 2002 | 營建業經驗累積與學習模式之建立(2/2) | 曾惠斌 | ||||
77 | 2002 | 供應鏈理論應用於營建業電子商務之研究 | 曾惠斌 | ||||
78 | 2002 | A 3-D graphical database system for landfill operations using GPS | Tserng, H.P.; Russell, J.S.; HUI-PING TSERNG | Computer-Aided Civil and Infrastructure Engineering | |||
79 | 2002 | An accelerated subcontracting and procuring model for construction projects | Tserng, H.P.; Lin, P.H.; HUI-PING TSERNG | Automation in Construction | |||
80 | 2002 | A framework of electronic tendering for government procurement: A lesson learned in Taiwan | Liao, T.S.; Wang, M.T.; Tserng, H.P.; HUI-PING TSERNG | Automation in Construction | |||
81 | 2001 | 營建業經驗累積與學習模式之建立(1/2) | 曾惠斌 | ||||
82 | 2001 | Interactive path planning for multi-equipment landfill operations (vol 10, pg 155, 2000) | Tserng, H. P.; Ran, B.; Russell, J. S.; HUI-PING TSERNG | Automation in Construction | |||
83 | 2001 | 營建工程資訊運籌管理系統之研究(2/2)─子計畫二:施工資訊運籌管理系統之研究 | 曾惠斌 | ||||
84 | 2000 | 院頒砂石車安全管理方案執行成效評估制度之研擬 | 周家蓓 ; 曾惠斌 | 研考雙月刊 | |||
85 | 2000 | 營建工程資訊運籌管理系統之研究(1/2)─子計畫二:施工資訊運籌管理系統之研究 | 曾惠斌 | ||||
86 | 2000 | 利用衛星定位(GPS)建立工程施工作業路徑即時管控系統之研究 | 曾惠斌 | ||||
87 | 2000 | Determining minimum contract time for highway projects | Shr, J. F.; Thompson, B. P.; Russell, J. S.; Ran, B.; Tserng, H. P.; HUI-PING TSERNG | Construction 2000: Materials and Construction | |||
88 | 2000 | Interactive path planning for multi-equipment landfill operations | Tserng, H.P.; Ran, B.; Russell, J.S.; HUI-PING TSERNG | Automation in construction | |||
89 | 2000 | Determining minimum contract time for highway projects | Shr, J.-F.; Thompson, B.P.; Russell, J.S.; Ran, B.; Tserng, H.P.; HUI-PING TSERNG | Transportation Research Record | |||
90 | 1999 | 營建工程施工機具作業現場及時管控系統之研究 | 曾惠斌 | ||||
91 | 1999 | 營建工程資訊運籌管理之整合型研究─子計畫三:施工資訊運籌管理系統之研究(I) | 曾惠斌 | ||||
92 | 1998 | AutoPave: Towards an automated paving system for asphalt pavement compaction operations | Krishnamurthy, B.K.; Tserng, H.-P.; Schmitt, R.L.; Russell, J.S.; Bahia, H.U.; Hanna, A.S.; HUI-PING TSERNG | Automation in Construction | |||
93 | 1998 | Computer-integrated collaborative design and operation in the construction industry | Veeramani, D.; Tserng, H.P.; Russell, J.S.; HUI-PING TSERNG | Automation in Construction | |||
94 | 1996 | OPSALC: A computer-integrated operations planning system for autonomous landfill compaction | Tserng, H.-P.; Veeramani, D.; Kunigahalli, R.; Russell, J.S.; HUI-PING TSERNG | Automation in Construction | |||
95 | 1995 | Motion Planning for an Autonomous Compactor in a Waste Landfill Site | Kunigahalli, R.; Russell, J.S.; Tserng, H.?P.; HUI-PING TSERNG | Computer?Aided Civil and Infrastructure Engineering |